CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO3-262 Issued: 12/08/03 Parcel Number: 984-905-006
Job Address: 1840 Manle Hills Common Zoning: RiII Type: V_N Occupancy: R_3
Total Occupant Load: 8/2 Nature of Work: Construct Sinele-family Dwelling
with basement aaraee
Owner: David Belt Contractor: Owner
GENERAL CONDITIONS APPLY; See last uaee
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF,OiTTRF,n TNRPF.C"TT(1NC
A UPUl1[7T'i TT A TL'
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaning
the site
f';
~' `
~ \)
-
FOOTINGS -per engineered details
Setbacks
Footings
Forms
Reinforcement -per engineering
Interior Footings- per engineering
Porch Footings- per engineering ~,
UFER 1
\
FOUNDATION -per engineered detail; all
elements of engineering require inspection prior to
cover
Retaining Wali
Stem Wall
Forms
Reinforcement -per engineered detail
Anchor Bolts & Washers -per engineering
Post to Foundation Wall Positive Connection
Engineered Holdowns
REQUIRED iNSPFCTi(1NC
Building Permit #B[.D03-262 -~
A DDDl1~7L'TT A TLS +
- - - ----
SLAB t-al1l~V 11JL/LAlL`
Interior footings
Thickened edge (grade beam on plans)
Anchor Bolts
Engineered Holdowns
FLOOR FRAMING
NOTE: Engineered BCI floor plan on-site and
available to the Inspector at time of inspection
Joists
2 x 10's
2 x 8's
Blocking
Positive Connections
Beam Pockets
Treated Wood to Concrete
Anchor Bolts & Washers
PLUMBING
Rou -In (D-V-T & Clean outs)
~- ~~ ~"~ ~ ~~
Water upp y
Water Hammer Arrestors
Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater- elevate source of ignition minimum of
18" above garage floor
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL
LPG Stove /Fireplace -provide specs on-site
Wood/ LPG Stove
Oil Heater- elevate source of ignition minimum of
18" above gazage floor
Manufacturer's installation instructions to be on-site
@ time of inspection.
Whole House Fan -Second Floor Bath
Source Specific Fans
Enviromnental Air Exhaust ducting (w/back draft
dampers), insulation (R-4) and terminus (located 3'
from opening into building)
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Building Permit kBLD03-262
RE UIRED INSPECTIONS
APPROVED/D TE
FRAMING t-``~-c~~e 2 ,-rt,~f~GS~ 3~z<l- ~-
Walls -framing per shear wall designations ~ '~- ~ ~--
Engineered shear walls
Shear Panel Blocking
Rafters
Rafter positive connection
Attic venting -ridge & eave ~ ~
Posts, beams and headers -per engineering
Positive connections
H- 6 hardware at studs to top plate -per engineering
Windows -escape
Windows -safety glazing ,
Window U-factor - 0.40 or better "~
Door U-factor - 0.20 or better
Skylight U-faotox - 0.58 ox better
NFRC sticker must be on windows, doors &
skylights at time of inspection
Air Seal
Fresh Air Intake -Wall Ports
Fireblocking
Weather Resistive Barrier
INSULATION _
!l
Floor (R-30) i '~ "/ _/
Walls (R-21) ~'
Ceiling (R-38) ' -
~
Baffles ~-
~ ~
Vapor Barrier - 4 mil poly barrier
DRYWALL NAILING ~
-
Walls --' "
Ceiling
Enclosed Usable Space under Stairs ~ '" _. _,
Garage House Occupancy Separation ;r ., '~
FINAL
Public Works Sign-off 1
LPG
Wood Stove ~'
i
House Numbers - 5" numbers ce/
Plumbing i
.
~ ~ ~"
Mechanical/Heating /
~
Insulation Certificate
Fresh Air Certification for Integrated System ; .-,, ~,
Smoke Detectors
Stairs, Decks & Landings
Final -building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Permit #BLD03-262 •~•
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheatLjng; -aud alternate braced
wall panels (ABWP) require inspection prior to cover. ~ _
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is rem~ired. P~,hue wnrkc n.,.,r...,9~
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
Waterman and Katz Building
181 Quincy Slrcet, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Paz: (360)385-7675
i
M
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
CITY OF PORT TOWNSEND
Permit Number: BLD03-262R-1 Issued: 01/09/04 Parcel Number: 984-905-006
Job Address: 1840 Maule Hills Common Zoning: RR=II Type: V_N Occupancy: RR=3
Total Occupant Load: 8/2 Nature of Work: Revision #1: see revision form for various
revisions; attached eneineer's letter of
approval
Owner: David Belt
Contractor: Owner
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
No changes to original Inspection Record. See
attached list of revisions, revised plan drawings and
engineers letter
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's reeistration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Building Permit NBLD03-262R-1
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspecfion on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required Public Works aunroval
must be received arior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
S. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval urior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. '
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2