HomeMy WebLinkAboutBLD03-260Waterman & Katz Building
181 QWnq Stree4 Suite 307
Port Tmvmend, WA 98368
Phone: 360.379-3208 Faz 360.3857675
TOWNSEND
Permit Number: BLDO3-260 Issued: 12/31/03 Parcel Number: 968100 603
Job Address: 3090 & 3096 Alder Street Zoning: R-III Type: VV=N Occupancy: RR=3
Total Occupant Load: 1 Nature of Work: Set New 504 sg. ft. Manufactured Home and build
180 su. ft. deck. See BLD03-260R-1 for same home set on same lot.
Owners: David & Ruth Whitney Contractor: Vern Garrison Construction - VERNOGC06208
****Installer: See Attached Installer Tai?****
r~
~~
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor 8c Industries @ 360-417-2702
Revision required for structural attachment per Jean Walat letter datedl2/08/03 (attached)
REQUIRED INSPECTIONS
APPRnVFII/IIATF.
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2 and attached details with Street
Development Permit MIP03-140
Silt Fence as needed _ . R ~` - -
Drive Off Mat to prevent sediment from leaving -
the site _ - ~ ;,
FOOTINGS/SLAB
Setbacks
Forms
~aiu€oxse,merit-- __---- -___ --- -
_ _ -_..
FLOOR FRAMING (prior to skirting)
Anchors
Steel Support Piers -Load-stamped and installed per
manufacturer's installation manual; clearance of 18"min.
from lowest point of I--beam and the ground or footing for
min. of 75% of area under home w/ 12"min. elsewhere unless
installation manual specifies; otherwise area around home
graded to provide runoff away from home
J
~i
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Permit #BLD03-26,
RE UIRED INSPECTIONS APPROVED/DATE
PLUMBING:
Water Supply-Main shut-off valve (port or ball valve) installed
in water supply piping prior to connection to home, min. '/, "
diameter, same as supply pipe
Pressure Reduction Valve
Hose Bibs (backflow protection required)
Pipe Insulation -Outside & in crawl space
Presswe Test -100 p.s. i. for 15 minutes
Pressure relief valve drain - to exterior of skirting, exhaust
downward between 6"and 24"above ground
Drainage Piping -sloped min. %s' per foot
MECHANICAL
Ducts & Duct Insulation
Dryer Exhaust -vented to outside. Extension into crawl space
requires venting through skirting with no dips; follow dryer
manufacturer's instructions; total combined length ofducting not
to exceed 14' w/ 2-90° elbows ~ J
J
FRAMING -revision required for structural, roofed
connection of (2) homes per attached letter dated 12/8/03
Deck/Stairs/Landings Outside Front and Back Doors
VAPOR BARRIER
b mil black poly ground cover (not required where area under
home is concrete slab floor with a minimum thickness of 3-''/s ~
inches) J~,
/~
F[NAL -roofed, structural connection of buildings required
prior to occupancy V
Public Works Sign-Off
Electrical (L & I) Sign-Off ~
~
House Number -minimum 5" numbers ! '
Plumbing
Mechanical n /
Deck t'
Pressure-Treated Framing
Positive Connections
Final -Building
No holes or gaps greater than `/s "allowed in skirting.
Crawl space ventilation per installation manual @ 1/ISO (5
required.); tocated close to corners, on at feast two opposing
sides for cross ventilation.
Crawl space access must provide access to all areas and
home; minimum 18"x 24"; covered with vinyl, pressure tre ted
wood or metal.
0911 dR tlnn re hnfnra vnn dirr fnr n4ili4~r B..n 1.,....+o..
__ - / -~ --d -..- -...~~...J .......o
1-800-424-5555
Page 2 of 3
r
Permit NBLD03-260
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contraMor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's fmal inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3
i
Waterman & Katz Building
181 QWncy 9tree4 SWte 301
Port Townsend, WA 98366
Phone: 360.3794208 Fax 360.3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO3-26OR-1 Issued: 12/31/03 Parcel Number: 968 100 603
Job Address: 3090 & 3096 Alder Street Zoning: R=III Type: VV=N Occupancy: RR=3
Total Occupant Load: 1 Nature of Work: Set New 504 sa. ft. Manufactured Home and build
180 sa. ft. deck. See BLD03-260R-1 for same home set on same lot
Owners: David & Ruth Whitney Contractor: Vern Garrison Construction - VERNOGC06208
****Installer: See Attached Installer Tae****
u
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOUHiED:
Electrical -Contact Labor & Industries @ 360-417-2702
Revision required for structural attachment per Jean Walat letter datedl2/08/03 (attached)
RF,nTTTRF,>) TNSPF.C'TTt7NS
e npunvFnm a T>~
TEMP EROSION & SEDIMENT CONTROL
See General Condition #2 and attached details with Street
Development Permit MIP03-140
Silt Fence as needed
Drive Off Mat to prevent sediment from Ieaving
. .
~ ~esi-t}Q ; -~-t.
FOOTINGS/S AB
Setbacks
Forms
REirrfarcement __ _
._
__
FLOOR FRAMING (prior to skirting)
Anchors
Steel Support Piers -Load-stamped and installed per
manufacturer's installation manual; clearance of 18"min.
from lowest point of I-beam and the ground or footing for
min. of 75% of area under home w/ 12 "min. elsewhere unless
installation manual spec fes; otherwise area around home
graded to provide runoff away from home
Y I '~ Call 8 hours before you dig fo l/-.
L ~ r utility line locates
1-800-424-5555
Page 1 of 3
,%
i i~
REQUIRED INSPECTIONS
PLUMBING:
Water Supply -Main shut-off valve (port or ball valve) installed
in water supply piping prior to connection to home, min. '/s "
diameter, same as supply pipe
Pressure Reduction Valve
Hose Bibs (backflow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test -100 p.s. i. for 15 minutes
Pressure relief valve drain - to exterior of skirting, exhaust
downward between 6"and 24"above ground
Drainage Piping -sloped min. '/.'per foot
MECHANICAL
Ducts & Duct Insulation
Dryer Exhaust -vented to outside. Extension into crawl space %~
requires venting through skirting with no dips; follow dryer ~ /
~
manufacturer's instructions; total combined length of ducting not "
to exceed 14' w/ 2-90° elbows
FRAMING -revision required for structural, roofed
connection of (2) homes per attached letter dated 12/8/03 "~
Deck/Stairs/L,andings Outside Front and Back Doors
VAPOR BARRIER
6 mil black poly ground cover (not required where area under
home is concrete slab floor with a minimum thickness of 3-''/z
inches)
FINAL -roofed, structural connection of buildings required
prior to occupancy
Public Works Sign-Off
Electrical (L & I) Sign-Off 4
House Number -minimum 5" numbers
Plumbing
Mechanical
Deck ,!~
Pressure-Treated Framing
Positive Connections
Final -Building
No holes or gaps greater than %a"allowed in skirting. j
Crawl space ventilation per installation manual @ 1/150 (5 `
required.); located close to corners, on at least two opposing
sides for cross ventilation. ~~
Crawl space access must provide access to all areas under
home; minimum 18"x 24"; covered with vinyl, pressure treated
wood or metal.
L Permit #BLD03-26bY2-.''''- -
APPROVED/DATE
~.au 4a Hours oerore you a~g for uttnty one locates
1-800-424-5555
Page 2 of 3
~t
Permit #BLD03-260R-0
. GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11 3 85-2 294. Measures shall include installation of silt fencing and
graveled constriction entrance (see attached details). Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspeMed. For Public Works inspection ca11385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
. scheduling the Building Department's Emil inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
banding permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3