Loading...
HomeMy WebLinkAboutBLD03-260Waterman & Katz Building 181 QWnq Stree4 Suite 307 Port Tmvmend, WA 98368 Phone: 360.379-3208 Faz 360.3857675 TOWNSEND Permit Number: BLDO3-260 Issued: 12/31/03 Parcel Number: 968100 603 Job Address: 3090 & 3096 Alder Street Zoning: R-III Type: VV=N Occupancy: RR=3 Total Occupant Load: 1 Nature of Work: Set New 504 sg. ft. Manufactured Home and build 180 su. ft. deck. See BLD03-260R-1 for same home set on same lot. Owners: David & Ruth Whitney Contractor: Vern Garrison Construction - VERNOGC06208 ****Installer: See Attached Installer Tai?**** r~ ~~ GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor 8c Industries @ 360-417-2702 Revision required for structural attachment per Jean Walat letter datedl2/08/03 (attached) REQUIRED INSPECTIONS APPRnVFII/IIATF. TEMP EROSION & SEDIMENT CONTROL See General Condition #2 and attached details with Street Development Permit MIP03-140 Silt Fence as needed _ . R ~` - - Drive Off Mat to prevent sediment from leaving - the site _ - ~ ;, FOOTINGS/SLAB Setbacks Forms ~aiu€oxse,merit-- __---- -___ --- - _ _ -_.. FLOOR FRAMING (prior to skirting) Anchors Steel Support Piers -Load-stamped and installed per manufacturer's installation manual; clearance of 18"min. from lowest point of I--beam and the ground or footing for min. of 75% of area under home w/ 12"min. elsewhere unless installation manual specifies; otherwise area around home graded to provide runoff away from home J ~i Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit #BLD03-26, RE UIRED INSPECTIONS APPROVED/DATE PLUMBING: Water Supply-Main shut-off valve (port or ball valve) installed in water supply piping prior to connection to home, min. '/, " diameter, same as supply pipe Pressure Reduction Valve Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Presswe Test -100 p.s. i. for 15 minutes Pressure relief valve drain - to exterior of skirting, exhaust downward between 6"and 24"above ground Drainage Piping -sloped min. %s' per foot MECHANICAL Ducts & Duct Insulation Dryer Exhaust -vented to outside. Extension into crawl space requires venting through skirting with no dips; follow dryer manufacturer's instructions; total combined length ofducting not to exceed 14' w/ 2-90° elbows ~ J J FRAMING -revision required for structural, roofed connection of (2) homes per attached letter dated 12/8/03 Deck/Stairs/Landings Outside Front and Back Doors VAPOR BARRIER b mil black poly ground cover (not required where area under home is concrete slab floor with a minimum thickness of 3-''/s ~ inches) J~, /~ F[NAL -roofed, structural connection of buildings required prior to occupancy V Public Works Sign-Off Electrical (L & I) Sign-Off ~ ~ House Number -minimum 5" numbers ! ' Plumbing Mechanical n / Deck t' Pressure-Treated Framing Positive Connections Final -Building No holes or gaps greater than `/s "allowed in skirting. Crawl space ventilation per installation manual @ 1/ISO (5 required.); tocated close to corners, on at feast two opposing sides for cross ventilation. Crawl space access must provide access to all areas and home; minimum 18"x 24"; covered with vinyl, pressure tre ted wood or metal. 0911 dR tlnn re hnfnra vnn dirr fnr n4ili4~r B..n 1.,....+o.. __ - / -~ --d -..- -...~~...J .......o 1-800-424-5555 Page 2 of 3 r Permit NBLD03-260 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contraMor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's fmal inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3 i Waterman & Katz Building 181 QWncy 9tree4 SWte 301 Port Townsend, WA 98366 Phone: 360.3794208 Fax 360.3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO3-26OR-1 Issued: 12/31/03 Parcel Number: 968 100 603 Job Address: 3090 & 3096 Alder Street Zoning: R=III Type: VV=N Occupancy: RR=3 Total Occupant Load: 1 Nature of Work: Set New 504 sa. ft. Manufactured Home and build 180 sa. ft. deck. See BLD03-260R-1 for same home set on same lot Owners: David & Ruth Whitney Contractor: Vern Garrison Construction - VERNOGC06208 ****Installer: See Attached Installer Tae**** u GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REOUHiED: Electrical -Contact Labor & Industries @ 360-417-2702 Revision required for structural attachment per Jean Walat letter datedl2/08/03 (attached) RF,nTTTRF,>) TNSPF.C'TTt7NS e npunvFnm a T>~ TEMP EROSION & SEDIMENT CONTROL See General Condition #2 and attached details with Street Development Permit MIP03-140 Silt Fence as needed Drive Off Mat to prevent sediment from Ieaving . . ~ ~esi-t}Q ; -~-t. FOOTINGS/S AB Setbacks Forms REirrfarcement __ _ ._ __ FLOOR FRAMING (prior to skirting) Anchors Steel Support Piers -Load-stamped and installed per manufacturer's installation manual; clearance of 18"min. from lowest point of I-beam and the ground or footing for min. of 75% of area under home w/ 12 "min. elsewhere unless installation manual spec fes; otherwise area around home graded to provide runoff away from home Y I '~ Call 8 hours before you dig fo l/-. L ~ r utility line locates 1-800-424-5555 Page 1 of 3 ,% i i~ REQUIRED INSPECTIONS PLUMBING: Water Supply -Main shut-off valve (port or ball valve) installed in water supply piping prior to connection to home, min. '/s " diameter, same as supply pipe Pressure Reduction Valve Hose Bibs (backflow protection required) Pipe Insulation -Outside & in crawl space Pressure Test -100 p.s. i. for 15 minutes Pressure relief valve drain - to exterior of skirting, exhaust downward between 6"and 24"above ground Drainage Piping -sloped min. '/.'per foot MECHANICAL Ducts & Duct Insulation Dryer Exhaust -vented to outside. Extension into crawl space %~ requires venting through skirting with no dips; follow dryer ~ / ~ manufacturer's instructions; total combined length of ducting not " to exceed 14' w/ 2-90° elbows FRAMING -revision required for structural, roofed connection of (2) homes per attached letter dated 12/8/03 "~ Deck/Stairs/L,andings Outside Front and Back Doors VAPOR BARRIER 6 mil black poly ground cover (not required where area under home is concrete slab floor with a minimum thickness of 3-''/z inches) FINAL -roofed, structural connection of buildings required prior to occupancy Public Works Sign-Off Electrical (L & I) Sign-Off 4 House Number -minimum 5" numbers Plumbing Mechanical Deck ,!~ Pressure-Treated Framing Positive Connections Final -Building No holes or gaps greater than %a"allowed in skirting. j Crawl space ventilation per installation manual @ 1/150 (5 ` required.); located close to corners, on at least two opposing sides for cross ventilation. ~~ Crawl space access must provide access to all areas under home; minimum 18"x 24"; covered with vinyl, pressure treated wood or metal. L Permit #BLD03-26bY2-.''''- - APPROVED/DATE ~.au 4a Hours oerore you a~g for uttnty one locates 1-800-424-5555 Page 2 of 3 ~t Permit #BLD03-260R-0 . GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11 3 85-2 294. Measures shall include installation of silt fencing and graveled constriction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspeMed. For Public Works inspection ca11385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to . scheduling the Building Department's Emil inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your banding permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3