Loading...
HomeMy WebLinkAboutBLD03-256Waterman & Katz Building 181 Qaioey Street, Suite 301 Port Towueend, WA 98368 Phoce: 360~79u086 Fez 360.3857675 u • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-256 Job Address: 1815 Lawrence Street Total Occupant Load: 2 Owner: Charles & Laurel Ankeny Issued: 11/14/03 Parcel Number: 957 312 706 Zoning: RR=II Type: ViN Occupancy: SS=2 Nature of Work: Frame existing aaraee door, add window Contractor: Baker Fine Woodworking GENERAL CONDITIONS APPLY: See last aa2e SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 As needed to prevent soil from leaving the site FRAMING ,' Red Head anchors ; ~ ~ Walls ~ Windows -escape L Windows -safety glazing - Window U-factor - 0.40 or better Door U-factor - 0.20 or better Skylight U-factor - 0.58 or better NFRC sticker must be on windows, doors & skylights at time of inspection Air Seal Fireblocking FINAL ~ House Numbers - 5" numbers "`, ~ Final-building i .. ~ i CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #B7A03-256 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC} measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public . Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are- required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval riot to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2