Loading...
HomeMy WebLinkAboutBLD03-255 CITY OF PORT TOWNSEND Waterman & Katz Building 181 Quincy Street, Sui[e 301 Port imwnsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO3-255 Issued: 11/06/03 Parcel Number: 948 314 201 Job Address: 1921 Sherman Street Zoning: R_II Type: V_N Occupancy: R I Total Occupant Load: No ChanEe Nature of Work: Remodel manaeer's office buildin¢ to create restroom meetine ADA requirements. Owner: Nor'West Villa>se -Port Townsend LLC Contractor: Same as Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 • • RF,nTTTRFT) TNSPF,('TTONC APPR(IVF.T1/nATF. DEMOLITION Materials from construction shall be deposited in approved areas off-site in accordance with all state and local laws and ordinances. PLUMBING -Barrier Free design required Rough-In (D-V-T & Clean outs) -- - __ -_ _ Pipe Insulation (R-3) ` Fixture and Mounting Heights MECHANICAL Source Specific Fan @ Bathroom -terminus 3' from building openings Environmental Air Exhaust ducting (with backdraft damper), insulation (R-4) and termination (3' from building openings) Ca1148 hours before you dig for utiUty line locates 1-800-424-5555 Page 1 of 3 Permit MBI.D03-255 FRAMING Walls ~` /~d~ Positive Connections ~ Lever Hardware (~ Blocking ~yt,. Threshold -maximum '/z " ~~ i ~ Fixture Mounting Heights and Dimensions Fireblockin ~ ~ i r g ~~ Manuvering Cleazances ~-) U ~ - ~'Z ~ ~J DRYWALL Walls INSULATION Fill exposed cavities FINAL Property address posted -min. 5"numbers of contrasting f?~- color posted near the main entrance of the building and ~r visible from the street per City ordinance. ,i!1~ Electrical Sign-off (L & n n ~ Barrier Free Access ~/ Thresholds D Cl ,1~ oor eazances Lever Hazdware ~ / ~~ Plumbing ~/ Wall & Floor Sanitation /~ Final -Plumbing Final- Mechanical Final - Buildin \ w -J GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. Ca1148 hours before you dig for utility line locates • I-800-424-5555 Page 2 of 3 Pttruit NBLD03-255 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. . 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is reaaired Public Works approval must be received prior to scheduling the Buildine DeoartmenPs final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or it no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3