CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD~3-2S1 Issued: 11/13/03 Parcel Number: 968-500-014
Job Address: 3912 Holcomb Street Zoning: R-II (PUDI Type: V_N Occupancy: R-3/U-1
Total Occupant Load: 712 Nature of Work: Construct Single-family Dwelling
with attached garage
Owner: Bill Schmidt Contractor: Camnbell Construction - CAMPBC*111LR
GENERAL CONDITIONS APPLY: See last sages
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
LYNNSFIELD PUD RESTRICTIONS APPLY, including limiting outdoor construction on
the site to the hours of 8 AM to 6 PM Monday through Friday, and prohibited on Saturdays,
Sundays, and National Holidays. Any exceptions made necessary by special and unusual
• circumstances must be approved in advance by the Building Official.
RE UIRED INSPECTIONS
•
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL See Correction Notice in File
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS See Correction Notice ~ File
Setbacks ~~
Footings _
Forms
Reinforcement
"
Interior Footings .;
' ,
Porch/Deck footings
LIFER
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 5
Building Permit #BLD03-251
REOiII`RF,D iNCPF.CTi(1NC ~unn~~~nrm ~.....
- --------
TION
S caaaaw~L'Lf ill'11ID
See Correction Notre in File
tem `V~I
F ~ ~
orms
Reinforcement
)
Anchor Bolts & Washers (l" (
Post to Foundation Wall Positive Connection ' l ~ j
Holddowns -per ABWP design ~`~
Vents -17 Re wired
FLOOR FRAMING See Correction Notice in F' e
NOTE: Engineered BCI floor plan on-site and
available to the Inspector at inspection time G
Girders ~,
Joists ~
Blocking
Post to Foundation Wall Connection
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
Holddowns -
er ABWP desi
n =~~`,
p
g
EXTERIOR SHEATHING See Correction Notice in File
NOTE: Do not cover prior to inspection
Brace Wall Panel Design
Alternate Braced Wall Panel Design
PLUMBING See Correction Notice in File
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestors
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve -REQUIRED
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief V alve drain to exterior, terminate
6" -24" above ground
Elevate source of ignition at least 18" above floor in
garage
.J
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 5
Building Permit #BLD03-251
•
CJ
•
REQUIRED INSPECTIONS
APPROVED/DATE
MECHANICAL See Correction Notice in File
Source Specific Exhaust Fans @ bathrooms (SOcfm),
laundry room, (50 cfm) and kitchen (100 c&n)
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3' from
openings).
Electric Furnace -elevate source of ignition at least 18"
above floor in garage
Whole house fan -Utility room
FRAMING--- ---
FPrescrtptive & designed braced wall panel sheathing See Correction Notice in File -
_,
cfs nailing must be inspected prior to cover
• `
/ ! i -- ~' ~ C~ ~~M
`' --+
~
Fjotsr mgr
n ,
Walls __"-- -~
Holddowns -per ABWP design
Interior Braced Wall Design -check for necessary
blocking at panel joints
Trusses -Engineered truss plan to be on-site at time of _ ~~
inspection
Rafters in vaulted living room
Attic venting -gable & eave ~" .
Posts, beams and headers
Windows -escape
Windows -safety glazing
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better
Skylight U-factor - 0.58 or better ~-
NFRC sticker must be on windows, doors & skylights
at time of inspection
~
Air Seal ~
Window Ports
Fireblocking-.
Weather Resistive Barrier
INSULATION See Correction Notice in File
Floor (R-30)
Walls (R-21)
Ceiling (R-38 attic; R-3Q vault)
Baffles
Vapor Barrier Paint
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 5
Building Permit #BLD03-25t
DRYWALL NAILING See Correction Notice i
File
Walls
C
ili ~
~
e
ng
I ~
' ~
nterior Btaced Wall Panel Design- Minimum 4 feet for
both sides, 8 feet for one side ~ ~
% /
1 } j
~
Gazage/House Occupancy separation "'~
~ ~
'~N~ See orrection Notice in File ,%
Public Works Sign-off
House Numbers - 5" numbers
Plumbing l )
Mechanical/Heating
Insulation Certificate ~ ~,
`'
Smoke Detectors -check for vaulted azea
Decks & Landings ~ ~
,\
Vapor Barrier Paint Certificate
Final -building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shaltbe temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing; and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is uaabte to pass final inspection on your project until Fublic
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is reauired Public Works anaroval
must be received urior to scheduling the Building Deaartment's final insuection.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 5
Building Perndt #BLD03-251
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
• 8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
CJ
Call 48 hours before you dig for utility line locates
1-800-424-5555