HomeMy WebLinkAboutBLD03-249
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
_. .~~ _
THIS CARD MU5T BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-249 Issued: 12/01/03 Parcel # 974-101-704
Job Address: 420 Reed Street Type: VV=N Occupancy: R-3
Total Occupant Load: No Chanee
Nature of Work: Addition of 192 square feet for Kitchen and Laundry Room
Owner: Bob Eneel Contractor: Troy Frutieer Home Crafting - TROYFHC98700
GENERAL CONDITIONS APPLY: See last 2 pages
REOTTTRF,1) TNSPECTTONC
A PPR (1VFT /il A TTi
FOOTINGS
Drill and Epoxy rebar into existing footings ~~
Prescriptive footing
~'
~
FOUNDATION ~
~
Drill and epoxy into existing foundation f, '.
Prescriptive foundation wall f
Foundation vents- 4
FLOOR FRAMING I
BCI engineering to be onsite for floor inspection `,
Floorjoists -
Ledger attachment ;
EXTERIOR SHEATHING-do not cover prior to ,
inspection ' I
Braced wall design
Alternate braced wall design
.
~.
/'
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer- needs to be accessible
Gas SuPP1Y <, j ,
Pipe Insulation (R-3) `
~-.~ t r
:~ti~ ,_ ~
.. 4.
Building Permit #BLD03-249
MECHANICAL
Source Specific Exhaust Fan @ kitchen(100cfm)&
(laundry (SOcfm)
LPG Downdraft stove- manufacturer's installation ~
manual to be onsite for inspection
FRAMING
Walls
Beams and headers-verb load transfer to existing
footing and foundation wall for GLB
Positive connections
Alternate Braced wall design hazdwaze
Rafters-2x12's ~`~)
Ledger attachment (/
Window U-factor - 0.35 or better
NFRC sticker must be on windows at time of
Inspection
Air Seal
n
/'
INSULATION
R-38 @ ceilings/ R-30 in vault
l j
R-21 in wa
ls /„
R-30 in floors 'I'//
i
DRYWALL NAILING
Walls
FINAL
House Numbers - 5"numbers
Insulation Certificate (if applicable) {
Vapor Bazrier Paint Certificate (if applicable) ~,;/
Smoke Detectors throughout existing construction:
one i
each
l
i
d i
h
/!
~
n
s
eep
ng room an
n eac
area ~
L
leading to sleeping rooms
Final -LPG ~'
~ ~
Final -building ~ ~'( ;i `.
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
Building Permit kBLD03-7A9
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
. Applicant is responsible for protection of adjacent properties.
3. Atl elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works adaroval
must be received prior to scheduline the Buildine Deaartment's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
• 9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•