Loading...
HomeMy WebLinkAboutBLD03-248Waterman & Katz Building 781 Quincy St, Suice 30] Port Townsend, WA 98368 Phone (360) 379-3208 Pax: (360) 385-7675 a CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO3-24g Issued: 10/15/03 Parcel Number: 989 704 201 Job Address: 702 Water Street Zoning: C_III Occupancy: No Chance Type: No Chance Total Occupant Load: No Chance Nature of Work: Repair and replace torcbdown roof, add insulation as needed (see below}. Owner: Donald Hoskins Contractor: Hope RooSnc - HOPER*043N7 NOTE: all roofing materials to be installed per manufacturer's specifications and UBC Chapter 15 GENERAL CONDITIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS APPR nVFi}/>7 A TF. . PEDESTRLAN PROTECTION Provide protection per UBC as needed during construction. See attached handout including Table 33-A for type of protection needed based on construction height and pedestrian distance from construction. SEDIMENT CONTROL Rights of way shall be kept free of dirt and debris and swept as needed during construction, DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. INSULATION I£ the roof sheeting is being replaced, the roof membrane is removed, exterior insulation is removed, or no insulation exists, the roof over a heated space must be insulated to the following values: Electric Heat: R-38 for roofs over attic, R-30 for other roofs Other Fuels: R-30 for roofs over attic, R-21 for other roofs ~ Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit #BLTHI;P~.248 C REOIIIRF,1) iNSPF.f'TiONC A DDD l1c7L~Tm ~ Tr • -------- - SHEATHING/NAILING (if applicable) a~+aa~v~aLllrll[i1L` 7/16" OSB requires 8d @ 6" o.c. edges & 12" field or 1'/." staples @ 6" o.c. edges and field. ROOF VENTING 1 sq. ft. for 150 sq. ft., or 1 sq. ft. for 300 sq. ft. if 50% of vents aze located at least 3 ft. above eave or cornice or a permanent vapor bazrier is installed on warm side of attic insulation. ROOF DRAINAGE Roof drains shall be sized and dischazged in accordance with the Uniform Plumbing Code. See attached pages from Appendix M of the WA State Amendments of the UPC. FINAL Building Numbers - 5" numbers of contrasting color posted neaz main entrance of building and visible from street Final -Building GENERAL CONDTTIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's re 'strati number and a City business license. Failure to provide proof of this documentation prior to work m result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall beinstalled on-site and inspected prior to beginning construction; ca11385-2294. Adjacentrights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. If your project included he Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385- 2294. Call 48 hours before you dig for utility line locates • I-800-424-5555 Page 2 of 3 ~ Permit #BLD03-248 . 7. Finai Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLAN5. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3