Loading...
HomeMy WebLinkAboutBLD03-246Walemen & Katz Building ]Sl Quincy Shee4 Smote 30t Port Towose~M, WA 98368 Photu:: (360)379-37A8 Pax: (360)395-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD TffiS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO3-246 Issued: 10/15/03 Parcel Number: 988-802-005 Job Address: 1104 Madison Street Zoning: RR=II Type: V_N Occupancy: RR=3 Nature of Work: Replace all existing sash windows with same size Lowen brand windows. Owuers: Bruce & Marianna Van Blair Contractor: Discovery Bav Coustruction - DISCOBC090B9 GENERAL CONDITIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPROVED/DATE FRAMING/FINAL: Windows -safety glazing where applicable per attached details. Window Ufactor - .40 or better NFRC wixdow sticker must be on windows at inspection time Air Seal FINAL _~ 7 Smoke Detectors throughout; battery powered Smoke Detectors adequate in existing ~ ~ G~ /~ construction / ~ House Numbers -min. 5" high i Final -Building C/ j~r Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 r~tasi.oo3-za6 GENERAL CONDITIONS i. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures sha116e installed on-site and inspected prior to beginning construMion; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting; etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspeMions. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspeMion on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is reauired Public Works aouroval must be received prior to scheduling the Building Deaartment's final inspection 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department. within one year. Call for at least one inspection per year to keep your buildiug permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WTTH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2