CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
~ THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO3-242 Issued: 11/19/03 Parcel Number: 997 502 006
Job Address: 2910 Kimball Court #11 Zoning: RR=II Type: V-N Occupancy: R-3acc.
Total Occupant Load: 4 Nature of Work: Construct Commons Buildine
Owner: Kimball Landis, LLC Contractor: Kimball Landis. LLC KIMBALL996D3
GENERAL CONDITIONS APPLY: See last aa¢e
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
REnTJTRE,T) TNSPE("TTONS
e rnunvFnm a •rF
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
._ __
-
F06TINGS -per architect's design
_-- -
Setbacks
F
i
oot
ngs
Forms ~
rr
'
t'
Reinforcement ~
/ -
t
,
Porch footings ;,
~ '/ ~~-, ~- ~ ~~
~
LIFER = ~
FOUNDATION -per architect's design
Stem Wall
Forms
Reinforcement
Anchor Bolts & Washers
Post to Foundation Wall Positive Connection
Holddowns -per architect's design
~~
~, i -
f " ,t- ~,~ l , - '-~~
`P~l', 1; ~t~, ~- r ~ - - F
~,.
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
Building Permit pBLD03-242
RF.OUiRET/ iNCPF.('TinNC A DDD l1VL+DT w mn
- --------
FLOOR FRAMING ~-aa aiw ~a~a~/LAaL'
Covered Porch - 2x8 @ 16" o.c.
Positive connections
SLAB ON GRADE
4" concrete slab w/6"x6" w1.4x1.4 wwm
2" rigid to top of slab(min. R-10)
Exterior slab and ramps- accessibility design
required
PLUMBING -
~
2~-
~~ ~
~
Rou -In (D-V-T & Clean outs -
L
`
-
- -_ -
Gas su SIC -r ~,
Water Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve -REQUIRED
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
Bathroom- accessibility design required
MECHANICAL
Source Specific Exhaust Fans @ bathroom (SOcfm),
and kitchen (100 cfm) whole house fan ~,, )
Environmental Air Exhaust ducting (w/ backdraft v
dampers), insulation (R-4) and terminus (located 3' ,`\')`
from openings)
Whole house fan -kitchen
EXTERIOR SHEATHING ~y,
,
Do not cover prior to inspection /
ABWP- Design per azchitect's design /
Braced wall panel design
J
Call 48 hours before you dig for utilityline locates
1-800-424-5555
Page 2 of 4
r1
u
u
RE UIRED INSPECTIONS
Building Permit NBLD03-242
APPROVED/DATE
FRAMING
Floor
Walls
Shear walls -per archilecl's deslgu _____..___
's _
.~ ~
Shear Panel Blockmg 3 x material required '- •-.
~~ ` ~-
- -_
~
~:_ .
r
~
J {
00 -per architect's design
-- ' J
`
-%
----- -- _
Attic venting -ridge & eave
Posts, beams and headers
Windows -safety glazing
Window U-factor - 0.40 or better ;
Door U-factor - 0.20 or better `!~~'
NFRC sticker must be on windows, doors & skylights
at time of inspection
Air Seal ~
Fresh Air Intake -window ports , `J
Fireblocking ~,
Weather Resistive Barrier
INSULATION
wails (R-~ ;- ~._,
Ceiling (R-38, attic; R-30 vault) u`
Baffles
Vapor Barrier -paint
FINAL
Public Works Sign-off
House Numbers - 5" numbers
Plumbing
Gas final
Mechanical/Heating
Bathroom- barrier free design
Insulation Certificate
Smoke Detectors
Stairs, Decks & Landings
Final -building
• Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 4
Building PermitNBLD03-242
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's reastration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of-way.shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required Public Works aaaroval
must be received prior to scheduline the Buildine Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates •
1-800-424-5555
Page 4 of 4
°`°°p"°~~sm CITY OF PORT TOWNSEND PUBLIC WORKS
U DEVELOPMENT SERVICES DEPARTMENT
• ~OFWPSN~a INSPECTION REPORT
,,:,~
PERMIT NUMBER: 5 L V L~ ~ ,l /~ ~
Address V~~~ ~ (r ]~tY1~_~~C{(1 ~'2.~
Contractor ~I Y~ ~~C.t L ~ 1~1'~C~ l
Owner ~ iYl r.i ~ ~ ~ Ct .
Date of Inspection ,Y-~-~C~' -~.~~` '~ ~~4
Worksite or Cell Phone# ! ~_(~ ~ 7
^ Erosion/Sedimentation J Plumbing/Top Out ~ Drywall/Fire Wall
0 Setbacks/Footings/LIFER :.] Gas Pipe/Pressure Test > Gas/Wood Appliance
^ Foundation Walls ~ Propane Tank/Line J Manufactured Home Set-up
^ Slab Interior Footing/Insulation ~ Mechanical ~ Public Works
^ Groundwork/Plumbing Test ^ Framing ~ Other/Consultation
^ Underfloor Framing ~ Insulation
^ Shear Wall/Holdowns ~ Interior Shear/BWP Nail FINAL
If corrections required, re-inspection must be done prior to cove ng or concealing areas
of construction. Additional fees may be assessed for multiple re-inspections.
For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM.
NO OCCUPANCY UNTIL FINALIZED~B~..Y,~~BUILOING AND, IF APPLICABLE, PUBLIC WORKS.
^ VIOLATION J®`APPROVAL ^ CORRECTION REQUIRED
^ APPROVED WITH CORRECTION ^ NEED APPROVED PLANS & PERMIT ON SITE
- -
Approved plans and permit card must be on-site and available at time of inspection.
~;' ,f
/`' I
Inspector ~ ~ `"~ ~~.Tf _/ _ _ Date o~~ Q r ¢7Ll