Loading...
HomeMy WebLinkAboutBLD03-240! R Waterman & ILatz Building l81 Quincy Street, Suite 301 Port Towuaeud, WA 96768 Phoue: 360-379-5086 Fax 360-3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-240 Job Address: 924 Washington Street Total Occupant Load: 13+existing Owner:Frangipani Corporation Issued: 12/22/03 Zoning: CC=3 Parcel Number: 989-705-704 Type: VV=N Occupancy: B Nature of Work: Construct new passageway between two existing rooms Contractor: Rick Nelson Construction RICKNC*1580S GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF[111TRFil TNCPF.('Tit1NC APPRnVFnm ATF TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 As needed to prevent soil from leaving the site l ~~` k" FRAMING - y ' Walls ; Headers i~-~'~ "° ~ ?~ r Blocking t ~ , ~,;~ -~ Positive connections -i 1 ~+~_ 1 , r , Air Seal j 1~` ` '~ ~` Fireblocking ~+'~ ;,r DRYWALL 4' ~'' ~ ( . ~ ' 1_ , Wa11s ~ ~ ~ ~ r, ~ "~ i ~~ ~~~ ~ Ceiling ~ ~ , /' ~ u y ,.yea- { , t ~ . ~ ~ ~. FINAL -- -. Building Numbers - 5" numbers Final -building A • CALL 48 hours before you dig for Utility line locates 1-500-424-5555 Page 1 of 2 Building Permit #BLD(13-24G~ "` ~~~ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works auuroval must be received prior to scheduline the BuildinE Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval priOC to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. CALL 48 hours before you dig for Utility line locates • 1-800-424-5555 Page 2 of 2 dl.. To: City of Port Townsend Building and Community Development From: Richard M. Nelson, General Contractor Rick Nelson Construction Date: January 1, 2004 RE: Statement of Certification to verify structural changes to 924 Washington Street, Port Townsend, WA 98368, Jordini's Subs. An archway (5 x 7) has been installed in the hearing wall between dining areas at the business known as Jordini's Subs. Typical load bearing construction techniques were employed: 1). Three 2 x 6 studs (16" O.C.), were removed generating a 5' 3" span. 2). A # 1 D.F. 6 x 10 header with 2 x 6 trimmers was installed between the remaining 2 x 6 studs. 3). Each trimmer/ king stud system transfers the lohd to aligned and existing concrete foundation piers. Richard M. Nelson G1l ~l~c~i4 ' ~~~~?~~ NOTICE: Plans are approved excepting _ any snore or omissions. All work moat peas Inspection in cantbrmence w/th . all applicable codes and regulations. ntaci tii~ E~~Il~ 379 3265 pnar ~c'~ ~l 4 rn~'E?lilrl "3 °{} h~ 9Y r IOv ~~ HERMIT # ~ Z p +.~ ate I\'Sl'1:C'1'IO~T lil'sl'Oli'1' NAME Permit ~~ C~ ,~ JO NOT REMOVE THIS TAG Date ~ ' L,~ " ~ `~ By CITY OF PORT TOWNSEND, BUILDING & COMMUNITY DEVELOPMENT WATERMAN & KATZ BUILDING, 181 QUINCY ST, SUITE 301, PORTTOWNSEND, WA 98368 (360) 379-3208 YOU ARE HEREBY NOTIFIED THAT NO MORE WORK SHALL BE COVERED UPON THESE PREMISES UNTIL THE ABOVE VIOLATIONS ARE CORRECTED. WHEN CORRECTIONS HAVE BEEN MADE, CALL FOR REINSPECTION AT 3852294. YOU MAY APPEAL DECISIONS OF THE BUILDING OFFICIAL TO THE BOARD OF APPEALS WITHIN 15 DAYS OF INSPECTION DATE. FOR FURTHER INFORMATION CONTACT BCD AT (360) 379-3208