Loading...
HomeMy WebLinkAboutBLD03-239 WaOerman &. Katz Building 181 QWney Street, Suite 301 Por[TOwoseud, WA98368 Phone: 360.379-5086 Fax 360.3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO3-239 Issued: 11/14/03 Parcel Number: 997 502 006 Job Address: 2910 Kimball Court #1 Zoning: RR=II Type: VV=N Occupancy: RR=3 Total Occupant Load: 4 Nature of Work: Construct Single-family Dwelling Owner: Kimball Landis LLC Contractor: Kimball Landis LLC KIMBALL996D3 GENERAL CONDITIONS APPLY: See last sage SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF,OTTTRF.n TNCPF.(`TTnNC A ADU nt7>cn m A m>c TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Matto restrict sediment from leaving the site See Correction Notice in File ^v FOOTINGS -per architect's design See Correction Notice in Fil ^ Setbacks ~_ ~ ~~' Footings ,~, t Forms Reinforcement Interior Footings ~ , Porch footings LIFER FOUNDATION -per architect's design See Correction Notice in tIP ^ Stem Wall f_ . Forms Reinforcement Anchor Bolts & Washers Post to Foundation Wall Positive Connection Holddowns -per engineer design ~ Vents - 8 Required ~. ; 1 --r ~; ,- ~ ~~ CALL 48 hours before`you di~ for Utility line locates 1-800-424-5555 Page 1 of 4 Building Permit #03-239 , " REQUIRED 1<NSPF,C'Ti(1NC A uDD /1[7L'TT A TT. - - - ---- - FLOOR FRAMING +i~v ~ avLi ye-aiav See Correction Notice in File NOTE: Engineered BCI floor plan an-site and available to the Inspector at inspection time , , Girders Joists ~ .l Blocking ~ Post to Foundation Wall Connection ~? Positive Connections ~ Treated Wood to Concrete ~ f~ Anchor Bolts & Washers / Holddowns -per engineer design ~ . PLUMBING See Correction Notice in File Q' Rough-In (D-V-T & Clean outs) Gas supply ,~ Water Supply j Water Hammer Arrestors V Hose Bibbs - backflow protection required tt ~ Pipe Insulation (R-3) ~V Pressure Reduction Valve if> 80 psi Water Heater R-10 under if electric ., i ~~ Seismic Restraint - 2 places ~ Pressure Relief Valve drain to exterior, terminate " " 6 -24 above ground MECHANICAL See Correction Notice in File ^ Source Specific Exhaust Fans @ bathrooms (SOcfin), laundry mom, (50 cfin) and kitchen (100 cfin) Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) Whole house fan - f rst floor bath • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 REQUIRED INSPECTIONS • Building Permit #03-239 ` APPR nVFII/n A Tii°. FRAMING See Correction Notice in File ^ Floor -Engineered BCI plan to be on site at inspection Walls ~ ;` ; Sheaz walls -per engineer design , ~ l Shear Panel Blocking _ Roof -per engineer design ` , ~!;'~ Attic venting -ridge & eave Posts, beams and headers ';' ' Windows -escape - Windows -safety glazing .` Window U-factor - 0.40 or better Door U-factor - 0.20 or better ~ Skylight U-factor - 0.58 or better NFRC sticker must be on windows, doors & skylights at time of inspection .Air Seal - Fresh Air Intake -window ports Fireblocking Weather Resistive Barrier INSULATION See Correction Notice in File ^ Floor (R-30 ) Walls (R-21 Ceiling (R-38, attic; R-30, vault) Baffles ~_. _ Vapor Barrier -paint DRYWALL NAILING See Correction Notice in File ^ Walls _ '- Ceiling ~ ~ Concealed space under stairs FINAL See Correction Notice in File ^ Public Works Sign-off House Numbers - 5" numbers Plumbing Gas final MechazricaUHeating Insulation Certificate Smoke Detectors Stairs, Decks & Landings Final -building Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit #03-239 -• GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's retristration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction -shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works aunroval must be received arior to schedulin¢ the Buildine Deaartment's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done 6y the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 City of Port Townsend Development Services Department Waterman & Katz Building 181 Quincy Street Port Townsend, WA 98368 (360)379-3208 Fax: (360)385-7576 CERTIFICATE OF OCCUPANCY BLD03-239 Owner: Address: Location: Building (or portion): Use(s) permitted: Kimball Landis 2910 Kimball Court, #1 Port Townsend, WA 98368 Condominium #1 Single-Family Residence The above-referenced building or portion complies with the applicable requirements of the Port Townsend Building Code (PTMC 16.04), has passed all required inspections and may be used and occupied in the use and manner indicated above. This certificate of occupancy shall be posted in a conspicuous place on the premises and shall not be removed except by the Building Official. ' Approved: