Loading...
HomeMy WebLinkAboutBLD03-233r~ n LJ r1 \J • Waterman & ICah 13atlding 181 QWucy Street, SW[e 301 Port Towneeod, WA 98368 PMae: 360.379-5086 Fax360.3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-233 Issued: 10/29/03 Parcel Number: 972 600 705 Job Address: 1810 31`" Street Zoning: RR=II Type: VV=N Occupancy: R_3 Total Occupant Load: 3 Nature of Work: Construct Sinele-family Dwellin¢ Owner: O. John Needham Contractor: Owner GENERAL CONDITIONS APPLY: See last aa¢e SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.fITTTRF.l1 TNCPF.f'TTl1NC A PUUl1VL`T/tl A TL' TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site F ~IN6~ etbacks ' Footin s r -1.~..-~' -4 ~.~ ~ ` Forms -- -_I_. -~------.~ - Reinforcement Interior Footings Porclt~ootings ~7FE1Z } _ _ < FOUNDATION _ _ _ Stem Wall _ __ - Forms Reinforcement - Anehor Bolts & Washers Post to Foundation Wart Positive Connection Holddowns Vents -10 Required ~ ' ,y CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 .~ Building Permit k03-233 ~~~k vl`~~ REQUIRED INSPEC'TinNS evvunirGnm~m>c - _ _ _ FLOOR FRAMING NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time Girders Joists Blocking Post to Foundation Wall Connection '~ Positive Connections , P~ Treated Wood to Concrete ~ Anchor Bolts & Washers ~\ ,J Holddowns aii aia~ i aJ I , ~,_ 1 ~j PLUMBING Rough-In (D-V-T & Clean outs) Water Supply ~ LL\ Water Hammer Arrestors C ~1 LPG Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater ~~' R-10 under if electric Seismic Restraint - 2 places ~ Pressure Relief Valve drain to exterior, terminate ~' 6" -24" above ground ~ ME HANICAL G Stove -provide specs on-site Manufacturer's installation instructions to be on-site @ time of inspection. Source Specific Exhaust Fans @ bathrooms (SOcfin), laundry room, (50 c&n) and kitchen (100 cfin) Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) Whole house fan -Master Bath • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Building Permit #03-233 • U n REQUIRED INSPECTIONS A PPR f)VFT)/il D TF FRAMING ------- -- ---- Floor Walls Holddowns ~`~ Shear walls ~ ~ Shear Panel Blocking ~ Roof -Engineered truss plan to be on-site at time of inspection ~ Attic venting- ridge & eave ~~,' "~ Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - 0.40 or better Door U-factor - 0.20 or better Skylight U-factor - 0.58 or better NFRC sticker must be on windows, doors & skylights at time of inspection Air Seal Fresh Air Intake -Wall Ports Fireblocking Weather Resistive Barrier INSULATION Floor (R-30 ) Walls (R-~ Ceiling (R-38, attic; R-30 vault) Baffles Vapor Barrier -paint DRYWALL NAILING Walls Ceiling FINAL Public Works Sign-off House Numbers - 5" numbers Plumbing LPG Mechanical/Heating Insulation Certificate Smoke Defectors Stairs, Decks & Landings Final -building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Pertlrt[ #03-233 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works aanroval must be received prior to scheduling the Building Department's fmal inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All .building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 n,"{ .. r~, (, .~ °`"p0.Tip"~sm CITY OF PORT TOWNSEND PUBLIC WORKS ° BUILDING AND COMMUNITY DEVELOPMENT 9~O~WpSM~°~ INSPECTION REPORT PERMIT NUMBER: '~U)~ ~ _ ~~~ Address I~ ~1 ~ 3 ~ s f` S~. Contractor 1~11~~ i~~t-t-Lf 1\L2"~~-~ Owner Date of Inspection ~l~rlc Worksite or Cell Phone# ^ Erosion/Sedimentation ^ Plumbing/Top Out ^ Drywall/Fire Wall ^ Setbacks/Footings/UFER ^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance ^ Foundation Walls ^ Propane Tank/Line ^ Manufactured Home Set-up ^ Slab Interior Footing/Insulation ^ Mechanical ^ Public Works ^ Groundwork/Plumbing Test ^ Framing ^ Other/Consultation ^ Underfloor Framing ^ Insulation ^ Shear Wall/Holdowns ^ Interior Shear/BWP Nail FINAL If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED 8Y BUILDING AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION ]APPROVAL J CORRECTION REQUIRED i ., ~~ ~." - --~. ._ ,, ~,- ~ t : ,~ +-~ :" /T /~, ~ _ nk {. x r - v ~! '. i 1 ~ r. ~f Li ~ ~ ~. ~.__~.~ ~~' r- ,~- t--' _ ... f _, ., - - i ~ ;, , ,~--- / _ ~, ; , ~ - __ ,_ T ,~ - _~., -- ,: Approved plans and permit card must be on-site and available at time of inspection. '~ ~ ` L r- ' c, Inspector ~- Date