Loading...
HomeMy WebLinkAboutBLD03-226 d Waterman & Katz Building ISI Quincy StreeS Sui[e 301 Port Townsend, WA 98368 Phove: (360)344-3057 Fex: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-226R-1 Issued: 02/20/04 Parcel Number: 948 331 902 Job Address: 2000 Sims Wav Zoning: CC=II Type: NA-Fdn. Only Occupancy: NA-Foundation Only Nature of Work: Construct slab foundation for Victorian Hardware Occupant Load: NA Owners: Kelly-Hill Corporation Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: Special Inspection reauired for 3000 psi concrete. Special Inspector shall be Washington licensed engineer or ICBO certified inspector. ICBO certified inspector shall be listed in the current edition of WABO Agency and Inspector Register or present credentials to the Building Department .Holder or Permit Holder's Agent shall review and oversee correction of any and all deficiencies noted by required special inspections RF.nTTTRFTI TN, PF,CTT(1NC ernunvFmm~TF TEMPORARY EROSION & SEDIMENT CONTROL Graveled construction entrance and erosion control to be installed prior to beginning construction. Inspection required. DEMOLITION Materials from site demolition shall be deposited in areas off-site that meet all state and local laws GROUNDWORK PLUMBING -. R-10 under slab ( ~, ~' Pressure Test Pipe Joints Exposed Pipe Bedding Trap Seal Protection ,: , ~- Ca1148 hours before you did for utility line locates r 1-800-424-5555 Page 1 of 3 `- 4 . ,, . ~ i,: - -- ~ ,,:° OiJED INSPF,CTTnNC C/ Perntit p BLS)03-226R-I A DDD/IATT. Tm ~ mn -- - FOOTINGS - speci inspe tion required for concret G>z=~D I aia a acv ~ 1JL/LL'11 L` - c 4a.. n c t -7 C,fLrv ~- p~ Setbacks ~ Z ` 3/z4~o4 / 3l2 ~/~ 17 ~ `' Footin s Forms Reinforcement STRUCTURAL SLAB Setbacks Forms R-10 under entire slab Reinforcement Epoxied Dowels BASE PLATES Plates -per Metallic Building Company plans Anchor Bolts -per Metallic Building Company plans and structural sheets } ~ / s ~ . ~ ` ~ ~ ~% ~~" E~ L~TIONS • ~~ I. Contractors working oo this project are required to have a Labor & Industries contractor's reeistration • number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control ('I'ESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works anaroval must be received urior to scheduline the Buildine Department's final inspection ~~ U Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Permil # BLD03-226R-1 • 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3