HomeMy WebLinkAboutBLD03-222Waterman & Katz lim7ding
161 Quincy Steeet, SWfe 301
Port Towmeod, WA 98368
Phone: 360.379-5086 Fax360.3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THI5 CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO3-222 Issued: 11/12/03 Parcel Number: 001 022 009
Job Address: 1201 Olympic Street Zoning: R_II Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 8/2 Nature of Work: Construct Sinele-family Dwelling
with attached ¢araee
Owner: Brian & Jeanie Glasnell
Contractor: Owner
GENERAL CONDITIONS APPLY: See last aaee
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
REQUIRED INSPECTIONS
APPRnVF.I)/nATF,
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving 's
the site i
~` ;'
°`~ ~,
/
FOOTINGS - $ee Correction Notice in File
Setbacks
Footings
Forms
Reinforcement
Interior Footings `~~
Porch footings } t
UFER , ` ,r, U
FOUNDATION See Correction Notice in File
Stem Wall
Forms
Reinforcement i ~''
~
Anchor Bolts & Washers '1
~
Post to Foundation Wall Positive Connection `
'
Holddowns -per engineer design
Vents -14 Required '
CALL 48 hours before you dig for Utility -ine locates
1-800-424-5555
Page 1 of 4
Building Permit #BLD03-222
REOi7IRF,D TN~PF,('TTCINC A ADD l1\rG+T T A TT.
- -- -
FLOOR FRAMING
NOTE: Engineered BCI floor plan on-site and
available to the Inspector at inspection time
Girders
Joists
Blocking
Post to Foundation Wall Connection
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
Holddowns -per engineer design w• uiaicaa.~.
See Correction Notice in File
~ ,
~~ ll~J
JJ
1 ~ ~ 1 ~~
PLUMBING See Correcti n Noti , in File
Rough-In (D-V-T & Clean outs)
Gas supply
Water Supply
Water Hammet Arrestors
Hose Bibbs - backflow protection required
Pipe Insulation (R-3) j
Pressure Reduction Valve if> 80 psi
Water Heater
~
R-10 under if electric ~/'~
Seismic Restraint = 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL See Correction Notice in File
Source Specific Exhaust Fans @ bathrooms (SOcfin),
laundry room, (50 cfin) and kitchen (100 cfin)
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3' J
from openings)
Whole House Ventilation
HVAC Integrated Fresh Air
7" Smooth Duct minimum
Terminal Element - 8"
Clock timer on fiunace fan /y,
~
Other than motorized damper requires letter of L
%
certification for flow rates. d
Whole house fan-HVACIntegrated Option
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Building Permit NBLD03-222
REQUIRED INSPECTIONS
APPROVED/DATE
FRAMING See Correction Notice in File
Prescriptive & designed braced wall Danel sheathing
& nailing must be inspected prior to cover
Floor -Engineered BCI plan to be on site
Walls-_________---
olddowns -per engineer design
Sheaz walls -per engineer desigl ~~? ~--
Sheaz ane oc m
Roo - grneered truss plan to be on-site at time of
inspection
Attic venting -gable & eave
Posts, beams and headers
Windows -escape ~
Windows -safety glazing
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better ~'
Skylight U-factor - 0.58 or better j";
L
NFRC sticker must be on windows, doors & skylights
at time of inspection ~ _
~
Air Seal ~~)
Fresh Air Intake -integrated ~ ,'
Fireblocking `~' '
Weather Resistive Barrier
INSULATION See Correction Notice in File
Floor ~-30)
malls (R-21) `' ;
_
Ceiling (TF-38, attic; R-30, vault)
Baffles
Vapor Barrier -backed batts & 4 mil poly
DRYWALL NAILING See Correction Noh'ce in File -
Walls
Ceiling l?
(~ -'~ ( /
Concealed s ace under stairs '~
FINAL See Correction Notice in File
Public Works Sign-off
House Numbers - 5" numbers I
Plumbing ~
Propane final ~ " i
Electrical Final ~,
,
Mechanical/Heating " I
Insulation Certificate
Smoke Detectors
Stairs, Decks & Landings
Fresh Air Certification for Integrated System
Final -building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Permit #BLD03-222
GENERAL CONDITIONS _
1. Contractors working on this project are required to have a Labor & Industries •
contractor's reeistration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to coven
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required Public Works auaroval
must be received prior to scheduling the BuildinE Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if ao progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
~a
.~
Watervuv & Katz BuBdivg
181 Quivcy Street, Suite 301
Porl Tovveevd, WA 96366
P6oce:360.379-5086 Faa 360.3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO3-ZZZR-1 Issued: 11/12/03 Parcel Number: 001 022 009
Job Address: 1201 Olympic Street Zoning: RR=II Type: VV=N Occupancy: U-1/S-2
Total Occupant Load: 1 Nature of Work: Revision 1: Construct Detached Garase
Owner: Brian & Jeanie Glasnell Contractor: Owner
GENERAL CONDITIONS APPLY: See last oa8e
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
REQUIRED INSPECTIONS
APPROVF,D/DATF.
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
k'OOTINGS /SLAB See Correction Notice in File
Setbacks
Footings ~ ~ - ~ ~ ~, F
I ~ ~ L ~ ,
Interior fcotitfgs
`+
Forms
Reinforcement
Anchor Bolts & Washers
FOUNDATION See Correction Notice in File
Stem Wall
Forms ~
Reinforcement
........ .....
Anchor Bolts & Washers
Post to Foundation Wall Positive Connection
Holddowns
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 3
Building Pertni[ NBLD03-222R-1
RE UIRED INSPECTIONS
APPROVED/DATE
V
FRAMING See Correction Notice in File
Prescriptive & designed braced wall oanel
sheathing & nailine must be inspected Drior to
cover
Walls
Shear walls
Shear Panel Blocking
Roof
Rafters
Rafter positive connection
Posts, beams and headers
Weather Resistive Barrier
FINAL
Public Works Si
ff See rrection Notice in File
gn-o
House Numbers - 5" numbers / /
~
Final -building L J
L~
GENERAL CONDITIONS
1. Contractors working oa this project are required to have a Labor & Industries
contractor's re¢istration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Building Pertni[ #BLD03-222R-1
~ ~ 5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works auaroval
must be received urior to scheduline the Buildine Deaartment's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prlOr to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
~ _,
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3