Loading...
HomeMy WebLinkAboutBLD03-222Waterman & Katz lim7ding 161 Quincy Steeet, SWfe 301 Port Towmeod, WA 98368 Phone: 360.379-5086 Fax360.3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THI5 CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO3-222 Issued: 11/12/03 Parcel Number: 001 022 009 Job Address: 1201 Olympic Street Zoning: R_II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 8/2 Nature of Work: Construct Sinele-family Dwelling with attached ¢araee Owner: Brian & Jeanie Glasnell Contractor: Owner GENERAL CONDITIONS APPLY: See last aaee SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 REQUIRED INSPECTIONS APPRnVF.I)/nATF, TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving 's the site i ~` ;' °`~ ~, / FOOTINGS - $ee Correction Notice in File Setbacks Footings Forms Reinforcement Interior Footings `~~ Porch footings } t UFER , ` ,r, U FOUNDATION See Correction Notice in File Stem Wall Forms Reinforcement i ~'' ~ Anchor Bolts & Washers '1 ~ Post to Foundation Wall Positive Connection ` ' Holddowns -per engineer design Vents -14 Required ' CALL 48 hours before you dig for Utility -ine locates 1-800-424-5555 Page 1 of 4 Building Permit #BLD03-222 REOi7IRF,D TN~PF,('TTCINC A ADD l1\rG+T T A TT. - -- - FLOOR FRAMING NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time Girders Joists Blocking Post to Foundation Wall Connection Positive Connections Treated Wood to Concrete Anchor Bolts & Washers Holddowns -per engineer design w• uiaicaa.~. See Correction Notice in File ~ , ~~ ll~J JJ 1 ~ ~ 1 ~~ PLUMBING See Correcti n Noti , in File Rough-In (D-V-T & Clean outs) Gas supply Water Supply Water Hammet Arrestors Hose Bibbs - backflow protection required Pipe Insulation (R-3) j Pressure Reduction Valve if> 80 psi Water Heater ~ R-10 under if electric ~/'~ Seismic Restraint = 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground MECHANICAL See Correction Notice in File Source Specific Exhaust Fans @ bathrooms (SOcfin), laundry room, (50 cfin) and kitchen (100 cfin) Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' J from openings) Whole House Ventilation HVAC Integrated Fresh Air 7" Smooth Duct minimum Terminal Element - 8" Clock timer on fiunace fan /y, ~ Other than motorized damper requires letter of L % certification for flow rates. d Whole house fan-HVACIntegrated Option Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Building Permit NBLD03-222 REQUIRED INSPECTIONS APPROVED/DATE FRAMING See Correction Notice in File Prescriptive & designed braced wall Danel sheathing & nailing must be inspected prior to cover Floor -Engineered BCI plan to be on site Walls-_________--- olddowns -per engineer design Sheaz walls -per engineer desigl ~~? ~-- Sheaz ane oc m Roo - grneered truss plan to be on-site at time of inspection Attic venting -gable & eave Posts, beams and headers Windows -escape ~ Windows -safety glazing Window U-factor - 0.40 or better Door U-factor - 0.20 or better ~' Skylight U-factor - 0.58 or better j"; L NFRC sticker must be on windows, doors & skylights at time of inspection ~ _ ~ Air Seal ~~) Fresh Air Intake -integrated ~ ,' Fireblocking `~' ' Weather Resistive Barrier INSULATION See Correction Notice in File Floor ~-30) malls (R-21) `' ; _ Ceiling (TF-38, attic; R-30, vault) Baffles Vapor Barrier -backed batts & 4 mil poly DRYWALL NAILING See Correction Noh'ce in File - Walls Ceiling l? (~ -'~ ( / Concealed s ace under stairs '~ FINAL See Correction Notice in File Public Works Sign-off House Numbers - 5" numbers I Plumbing ~ Propane final ~ " i Electrical Final ~, , Mechanical/Heating " I Insulation Certificate Smoke Detectors Stairs, Decks & Landings Fresh Air Certification for Integrated System Final -building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Building Permit #BLD03-222 GENERAL CONDITIONS _ 1. Contractors working on this project are required to have a Labor & Industries • contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to coven 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works auaroval must be received prior to scheduling the BuildinE Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if ao progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 ~a .~ Watervuv & Katz BuBdivg 181 Quivcy Street, Suite 301 Porl Tovveevd, WA 96366 P6oce:360.379-5086 Faa 360.3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO3-ZZZR-1 Issued: 11/12/03 Parcel Number: 001 022 009 Job Address: 1201 Olympic Street Zoning: RR=II Type: VV=N Occupancy: U-1/S-2 Total Occupant Load: 1 Nature of Work: Revision 1: Construct Detached Garase Owner: Brian & Jeanie Glasnell Contractor: Owner GENERAL CONDITIONS APPLY: See last oa8e SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 REQUIRED INSPECTIONS APPROVF,D/DATF. TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site k'OOTINGS /SLAB See Correction Notice in File Setbacks Footings ~ ~ - ~ ~ ~, F I ~ ~ L ~ , Interior fcotitfgs `+ Forms Reinforcement Anchor Bolts & Washers FOUNDATION See Correction Notice in File Stem Wall Forms ~ Reinforcement ........ ..... Anchor Bolts & Washers Post to Foundation Wall Positive Connection Holddowns CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 3 Building Pertni[ NBLD03-222R-1 RE UIRED INSPECTIONS APPROVED/DATE V FRAMING See Correction Notice in File Prescriptive & designed braced wall oanel sheathing & nailine must be inspected Drior to cover Walls Shear walls Shear Panel Blocking Roof Rafters Rafter positive connection Posts, beams and headers Weather Resistive Barrier FINAL Public Works Si ff See rrection Notice in File gn-o House Numbers - 5" numbers / / ~ Final -building L J L~ GENERAL CONDITIONS 1. Contractors working oa this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Building Pertni[ #BLD03-222R-1 ~ ~ 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works auaroval must be received urior to scheduline the Buildine Deaartment's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prlOr to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. ~ _, Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3