HomeMy WebLinkAboutBLD03-221Waterman & Kazz Huildwg
181 Quincy Street, Suih 301
Port Towosrnd, WA 98368
Phone: (360)344-3057 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
CaI1385-2294 for Inspection
Permit Number: BLDO3-221 Issued: 10/10/03 Parcel Number: 930 300 201
Job Address: 2233 Walnut Street Zoning: RR=II Type: VV=N Occupancy: RR=3
Total Oceupant Load: NC Nature of Work: Construct new foundation under existing detached. garage.
Owner: Colby Fox & Marv Morrissey Contractor: Gre¢ Pelham - GREEWC*981DR
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
• RE UIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat (if no existing driveway) to restrict sediment
from leaving the site
DEMOLITION
Materials from demolition shall be disposed of in approved
azeas off-site that meet all qualifications set forth by state
and local laws
MONOLITHIC SLAB FOUNDATION _~'
- -
Setbacks -existing s
`'
Forms
Reinforcement ~-
_
Treated Sill Plate - _
Anchor Bolts and Washers
FINAL
Final -Building
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pumit # HLD03-221
C=ENERAi, CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a
Ciri business license. Failure to provide proof of this documentation prior to work may result in job shut down while this
is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning
construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see
attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require
inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspeMion on your project until Public Works requirements have been
completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required.
Public Works approval must be received prior to scheduline the Buildin Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building
Department within one year. Call for at least one iuspection per year to keep your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department~9-
3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2