HomeMy WebLinkAboutBLD03-220Waterman & Katz
181 Quincy Street Suite 301
Port TOwosend, WA 98368
PMne (360) 344-3057 Fax (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
I THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO3-220 Issued: 10/13/03 Parcel Number: N/A - Tyler Street Right-of-way
Job Address: Tvler Street between Washington and Water Streets Zoning: C-III Type: VV=N
Nature of Work: Construct new stair treads and handrails
Owner: City of Port Townsend
Contractor: Owner -City of PT Parks Deaartment
344-3040 Steve Carra
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
feJ
APPROVED/DATE
FOOTINGS/STRINGER FRAMING - no proposed changes
FRAMING/FINAL
Stairs & Handrails -see attached details
All wood materials to be pressure treated or wood of natural
resistance to decay
Posts if applicable
StaifTreads
- rise and run
- no open risers
- nosings
- slip resistant surface
Blocking
Positive Connections
Landings
Handrails
- gripping surface
- height
- extensions
- termination
- additional handrail @ 24" for children
- intermediate rails (where walking surface is > 30"above
grade)
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page I of 2
Pmnit # BLD03-220
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a Ciri business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion apd sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11 3 8 5-2 2 94. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required afrer inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection caI1385-2294. A
minimum of twenri-four hours notice is required. Public Works approval must be received prior to
scheduling the Building DepartmenNs final inspection.
7. Final Inspectiops are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire. if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at {east one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Departmept @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH TAE APPROVED PLANS.
Ca1148 hours before you dig utility line locates: 1-800-424-5555
Page 2 of 2