Loading...
HomeMy WebLinkAboutBLD03-218Watermno & Katz Building l91 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360.379-5086 Fax 360.3857673 • CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO3-21$ Issued: 11/07/03 Parcel Number: 963 700 218 Job Address: 71 Vista Blvd Zoning: RR=II Type: VV=N Occupancy: R-3/U-1 Total Occupant Load: 10/2 Nature of Work: C_ onstruct Single-family Dwelline with attached eara¢e Owner: Marco Sobrino Contractor: Waltenbaueh Const Co. WALTECC012BA GENERAL CONDITIONS APPLY: See last Wage SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site -FOOTINGS See Correction Notice in File ^ Setbacks Footings Forms Reinforcement Interior Footings Porch Piers Deck UFER CALL 48 hours before you dig for Utility line locates ` 1-800-424-5555 Page 1 of 5 Building Permit #03-218 REQUIRED ITTCPF,rTT(1NC evnun~r~nm~mc FOUNDATION See Correction Notice mile ^ Stem Wall \ ` Forms r_ "~ Vents - 21 required G-~ ,~ Crawl access through each stem wall section Reinforcement ~ Anchor Bolts & Washers ,~ Positive Connection interior stem walls to exterior ~ Holdowns -per engineer design ,~ %~ 1(/ FLOOR FRAMING See Correction Notice in Fide ^ NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time Joists ~ ) Blocking . ,/~ i " Positive Connections Treated Wood to Concrete , ~ / v ~'[ Anchor Bolts & Washers Foundation Cripple Wall ~ ~} Positive Connection Cripple Wall to Foundation Stem Wall ~~ PLUMBING See Correction Notice in File ^ Rough-In (D-V-T & Clean outs) LPG Rough-In Water Supply Water Hammer Arrestors '' Hose Bibbs - backflow protection required ~~ Pipe Insulation (R-3) Water Heater ~ R-10 under if electric ~ I _ Seismic Restraint - 2 places ~~ ]`// Pressure Relief Valve drain to exterior, terminate J 6" -24" above ground ~~ 18" above finished floor (applies to furnace also) J Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 5 Building Permit p03-218 MECHANICAL See Correction Notice in File ^ LPG Furnace LP _" G Fireplace LPG Venting Manufacturer's installation instructions to be on-site @ time of inspection. Ducts & Duct Insulation -Supply/fresh air ducts in - ' conditioned space: R-4; heating ducts in unconditioned space: R-8 Whole House Ventilation ` HVAC Integrated Fresh Air 7" Smooth Duct minimum Terminal Element - 8" . Clock timer on firrrlace fan Other than motorized damper requires letter of j certification for flow rates. Whole house fan -HVAC Integrated option Source Specific Exhaust Fans @ bathrooms (SOcfm), laundry room, (50 cfm) and kitchen (100 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) • FRAMING:. - See Correction Not%^° i,. Fi1e!L7 Prescriptive & designed braced wall panel sheathing ~ - `~ ~, , nailing must be inspected prior to cover 5. ?Walls _. ~. Sheaz Walls (including interior) -per engineer design ___- i `~ Shear Pane1,BlQCking _.___ ___ Roof-Engineered truss plan to be on site at inspection Truss positive connection ~ Attic venting -ridge & eave Posts, beams and headers ~ Windows -escape Windows-safety glazing `pfig ~ Jj~~~/ Window U-factor - 0.40 or better Door U-factor - 0.20 or better ,~ ~2t ~~ ~, f~ J ~ Skylight U-factor - 0.58 or better - ~- NFRC sticker must be on windows, doors & skylights Air Seal ~ Fresh Air Intake -window ports Fireblocking Weather Resistive Barrier C~ Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Building Pem~it N03-218 REQUIRED iNCPF.('TinNc A DDO A[ 7T T m ~ mr. ----- INSULATION Floor (R-30 ) Walls (R-~ Ceiling (R-38) Baffles Vapor Barrier-paint 6 mil black poly in crawl space L1111\VYL'L/Lt111`r See Correction Notice i ,File ^ ~ ~~ ~ C ~ ~ ~!, G `} ~ ~j JJJ DRYWALL NAILING Walls See Correction Notice in File ^ Ceiling f_ ~~ Gar e/Ho , e Occupancy Separation ~~ f~ Z. t -- ~ z-E~ y~ ~N~' See Correction Notice it; tde d Public Works Sign-off , ~~ ; House Numbers - 5" numbers Plumbing ^ LPG Furnace , LPG Fireplace ~ ~,, LPG Tank and Piping ~~ Mechanical/Heating Insulation Certificate Vapor Bartier Paint Certificate Fresh Air Certification for Integrated System J' Smoke Detectors ~'~ Stairs, Decks & Landings Final -building f GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's res>7stration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheefing, etc. Soils shall be Ca1148 hours before you dig for utility tine locates 1-800-424-5555 Page 4 of 5 Building Permit #03-218 permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received arior to schedulin¢ the Building Deuartment's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the • Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 ' ~`poA,>o~,2~m CITY OF PORT TOWNSEND PUBLIC WORKS DEVELOPMENT SERVICES DEPARTMENT 9A" ~ " ~ ~~ INSPECTION REPORT c~OF WASH~s` PERMIT NUMBER: ~ ~-~ Address ~ ~~ ~ -5~~. ~~G'~~ Contractor ~,~~r y S _ ~Jcx.{/'~-~Qit~~~ Owner l "1C~~~C~ -~~~i r~ i'tz Date of Inspection Worksite or Cell Phone# ^ Erosion/Sedimentation ^ Setbacks/Footings/LIFER ^ Foundation Walls ?~ /G ^ Plumbing/Top Out ^ Drywall/Fire Wall ^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance ^ Propane Tank/Line ^ Manufactured Home Set-up ^ Slab Interior Footing/Insulation ^ Mechanical ^ Public Works ^ Groundwork/Plumbing Test ^ Framing ^ Other/Consultation 1 ^ Underfloor Framing ^ Insulation hd~s~. rS ^ Shear Wall/Holdowns ^ Interior Shear/BWP Nail 3d'FINAL ~~ ~_ ,(~(~k If corrections required, re-inspection must be done prior to covenmg or concealing areas~~ ~(.J S ~y h of construction. Additional fees may be assessed for multiple re-inspections. 6F'~ r • For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. /~ j_ a _,y NO OCCUPANCY UNTIL FINALIZED BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS. 1^ VIOLATION J APPROVAL ^ CORRECTION REQUIRED APPROVED WITH CORRECTION ^ NEED APPROVED PLANS & PERMIT ON SITE f ~- !~?/.`/.eJPl ~~~-J'f'1}~}~ -n, /f ~i;, .:1= i~f :.t-' 'sp~7GA~~ C~. / f _"/ E' r_ TCL'- Approved plans and permit card must be on-site and available at time of inspection. i Inspector 1'- ,~ ~>`I~~~ _ Date __