Loading...
HomeMy WebLinkAboutBLD03-217 r! wnw~n.o ~ lt,e BnBaing 181 Qdncy Street, suite 701 Port Townsend, WA 98369 Phone: 360-379-SO9fi Fu 361F38S7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO3-21 ~ Issued: 11/12/03 Parcel Number: 001 093 007 Job Address: 3090 Discovery Road Zoning: RR=II Type: VV=N Occupancy: RR=3 Total Occupant Load: 7 Nature of Work: Construct Single-family Dwelling Owner: Donald Earl Contractor: Owner GENERAL CONDITIONS APPLY: See Pages 4 and 5 SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 REOi7iRF.D iNSPF.CTinNS APPRf1VF.n/>7ATF. TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed ___ -- - - Drive Off Mat to restrict sedirnerrt~om leaving the site _ .T___- , ~OOTING5 _ _ Setbacks ~ Footings ~`Ei ~ Forms ~ Reinforcement !, ~ ~ ~ Interior Footings ~ ~' ~ Porch Piers ~ , ~ Deck .; ~ r'~' UFER -- --------- __ ~ ~ ;~ , ~ FOUNDATION ~~~`~_ - ; / Stem Wall i ~' '..' Forms ~~ r , , I~ ' Bents =~i-reryurrec~. ~ i ~~ C l ~ 14•• , ; .r ~ t, raw access - ~~ ,. Reinforce _ _ ~ . ri1Sffi-- , , Anchor Bolts & Washers --- --J-` Post to Foundation Wall Positive Connection Holdowns CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 5 Building Permit #BLD03-217 RE IJIRED INSPECTIONS APPROVED/DA E FLOOR FRAMING Joists Blocking Positive Connections Treated Wood to Concrete Anchor Bolts & Washers T I ~,/~ /j IL /f PLUMBING Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestors Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater R-10 under if electric Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground MECHANICAL Electric Heat Pump Manufacturer's installation instructions to be on-site @ time of inspection. Ducts & Duct Insulation -Supply/fresh air ducts in conditioned space: R-4; heating ducts in unconditioned space: R-8 Whole House Ventilation HVAC Integrated Fresh Air 7" Smooth Duct minimum Terminal Element - 8" Clock timer on furnace fan Other than motorized damper requires letter of certification for flow rates. Whole house fan -HVAC Integrated option Source Specific Exhaust Fans @ bathrooms (SOcfm), laundry room, (50 cfin) and kitchen (100 cfm) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) Call 48 hours before you dig for utility line locates 1-800.424-5555 Page 2 of 5 i • RE UIRED INSPECTIONS Building Permi[ #BLD03-217 APPROVED/DATE MECHANICAL Electric Heat Pump Manufacturer's installation instructions to be on-site @ time of inspection. Ducts & Duct Insulation -Supply/fresh air ducts in conditioned space: R-4; heating ducts in unconditioned space: R-8 Whole House Ventilation HVAC Integrated Fresh Air 7" Smooth Duct minimum Terminal Element - 8" Clock timer on furnace fan Other than motorized damper requires letter of certification for flow rates. Whole house fan - HVAC Integrated option Source Specific Exhaust Fans @ bathrooms (SOcfin), laundry room, (50 cfin) and kitchen (100 cfin) Environmental air exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (3' from openings into building) FRAMING -~' p ,/~'l"'l~ :il`~C i >> Walls I t i h ll - --- ~~c~.~ n er or s ear wa s ..._ ~ ~lv Shear Panel Blocking '-- ~"" Roof-Engineered truss plan to be on site at inspection Truss positive connection Attic access Attic venting -ridge & eave Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - 0.40 or better Door U-factor - 0.20 or better Skylight U-factor- 0.58 or better NFRC sticker must be on windows, doors & skylights at time of inspection Air Seal Fresh Air Intake -window ports Fireblocking Weather Resistive Barrier Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Building Permit #BLD03-217 RE UIItED INSPECTIONS APPROVED/DATE ~`1 INSULATION Floor (R-30 ) Walls (R-21) Ceiling (R-38 ) Baffles Vapor Barrier -paint 6 mil black poly in crawl space DRYWALL NAILING Walls Ceiling FINAL Public Works Sign-off House Numbers - 5" numbers Plumbing Mechanical/Heating Insulation Certificate Vapor Barrier Paint Certificate Fresh Air Certification for Integrated System Smoke Detectors Stairs, Decks & Landings Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. u Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 Building Pemrit #BLD03-217R-1 FINAL Public Works Sign-off House Numbers - 5"numbers Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Buildine Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 watermaa & xaa ewiatog tet Qwaey street' swa Sot Port ToworeaA, WA 98368 PMne:360379-5086 Fax 360.3857675 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 85-22 94 for Inspection Permit Number: BLD03-217R-1 Issued: 11/12/03 Parcel Number: 001 093 007 Job Address: 3090 Discovery Road Zoning: RR_II Type: VV=N Occupancy: UU=1 Total Occupant Load: 2 Nature of Work: Revision #1: Construct Detached Garaee accessory to Single Family Residence (BLD03-2171 Owner: Donald Earl Contractor: Owner GENERAL CONDITIONS APPLY: See last oa2e SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RE UIRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Matto restrict sediment from leaving the site _ i a FOOTINGS /SLAB ~. Setbacks Footings ' Forms Reinforcement Anchor Bolts & Washers --,~ .4~ FRAMING ~ Walls 1 Interior shear walls ~,,. , ~ Sheaz Panel Blocking _ ~ Roof -Engineered truss plan to be on site at - inspection Truss positive connection Posts, beams and headers Weather Resistive Bazrier CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit #BLD03-217 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies . noted by required inspections. _ 5. Re-inspection is required after inspection report corrections are completed. • 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. $. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5 Q~` ~f`~""~'~~~ CITY OF PORT TOWNSEND ` ~ DEVELOPMENT SERVICES DEPARTMENT '~'~'wA~G~ INSPECTION REPORT PERMIT NUMBER: ~~L~1~3 -~~ ~ 2- I ~' ~7 Site Address Contractor Owner Date of Inspection Worksite or Cell Phone# ~ 7~ -Co ~o ~~' ^ Erosion/Sediment Control ^ Setbacks/Footings/LIFER ^ Foundation Walls ^ Footing Drainage ^ Slab/Interior Footing/Insulation Q 6roundwork/Plumbing Test ^ Underfloor Framing ^ Ext. Shear Wall/Holdowns ^ Plumbing/Top Out ^ Propane Pipe/Pressure Test ^ Propane Tank/Line ^ Mechanical ^ Framing ^ Insulation ^ Interior Shear/BWP Nail ^ Drywall/Fire Wall ~~~~~ ^ Propane/Wood Appliance ^ Manufactured Home Set-up ^ Fire Department ^ Temporary Occupancy ^ Fees Paid Final Occupancy ^ Other/Consultation For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection; for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re-inspections if the work is not ready and the inspector must return to the site. Failure to provide inspection record and approved plans on the site will result in $47 re-inspection fee charge. (OCCUPANCY REQUIRES PRIOR WRITTEN APPROVAL BY DSD.) ` ^ APPROVED ^ APPROVED WITH CORRECTIONS SEE BELOW ^ NOT APPROVED SEE COMMENT(S) BELOW f, ~ -` • Approved plans and permit card must be on-site and available at time of inspection. Inspector ~~ ~ ~ ~ - _ - ~ Date Acknowledged by ~ ~ ""~ ~ ~ - Date