Permit Number: BLDO3-21 f) Issued: 11/18/03 Parcel Number: 965 701 908
Job Address: 936 Benton Street Zoning: RR=II Type: VV=N Occupancy: R=3
Total Occupant Load: 1 Nature of Work: Enclose covered uorch, add two baths
Owner: Jonathan & Deborah Bakin Contractor: Crain Johnson, CRAIGJL992N2
GENERAL CONDITIONS APPLY: See last ua2e
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF.ni1TRF,n iNCPF,fTT()NS
A PPR l1t7-Gil/~l A TTi
TEMP EROSION & SEDIMENT CONTROL See Correction Notice in File
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOUNDATION See Correction Notice in File
Grade beam
Attachment to stemwall
Forms
Reinforcement
Anchor Bolts & Washers
Post to Foundation Wall Positive Connection
Vents - 3 Required
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
Building Permit #SLD03-216 ""t
REOUiRED iNSPF,( Ti(~NS euuunv~nm~m~
FLOOR FRAMING See Correction Notice in File "
Girders
Joists
Blocking `•.`
•`~` jj ~ .
Post to Foundation Wall Connection
Positive Connections ~ ~~
(~
~
Treated Wood to Concrete ,,
' ""
'
Anchor Bolts & Washers
H
ldd J-'
~ ~~ ~ ti 1~~
/
o
owns
PLUMBING See Correction Notice in File
Rough-In (D-V-T & Clean outs)
Water Supply // ~
C/"~
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under if electric (~1
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
"
" J
6
-24
above ground
MECHANICAL See Correcti Notice in File
Source Specific Exhaust Fans @ bathrooms (SOcfin),
laundry room, (50 cfin) and kitchen (100 cfin)
Environmental Air Exhaust ducting (w! backdraft
dampers), insulation (R-4) and terminus (located 3' l
from openings) ~
•
Ca1148 hours before you dig for utility line locates '
1-800-424-5555
Page 2 of 4
~~ ,
Building Permit #BIA03-216
~'^~~ " iT~`siaa^--"r~r^~ ~ ~_ APPR(1VFil/iIATF
~ .~
•
•
ING See Correc ~ once in Fidevv
rescriptive & designed braced wall panel sheathing &
` nailing must be inspected prior to cover
Floor ~
Walls
Shear walls
Shear Panel Blocking
~
Roof
Attic access ,•
Attic venting -ridge & eave `~~'%" ~ r
~
Posts, beams and headers ~ ~
~` ~
Windows -escape ~.
Windows -safety glazing j ;'
J
Window U-factor - 0.40 or better ~
~
Door U-factor - 0.20 or better
'Skylight U-factor- 0.58 or better `?
'
NFRC sticker must be on windows, doors c~ skylights /
`'
/'
'ttt time of,tns~ection
/
Air Seal
~
_
____,-~ 4 ~' ~ ;~
_
_
_ _
Fireblocking ~ ~ /'~
W
ather Resistive Barrier
f
~
-~ _ .--
-`
INSULATION See Correction Notice in File
Floor (R-30 )
Walls (R-~
Cei mg -_, attic; R-30, vault)
Baffles
Vapor Barrier -paint
DRYWALL NAILING See Correction Notice in File
Walls
Ceiling
FINAL See Correction Notice in File
Public Works Sign-off ~ ,
House Numbers - 5" numbers '~
~
Plumbing ~
1
Mechanical/Ileating .i
_
Insulation Certificate
Smoke Detectors
Stairs, Decks & Landings „ '
Final -building
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 4
Building Permit kBLD03-216 "\
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public •
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required Public Works approval
must be received prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
S. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates •