Loading...
HomeMy WebLinkAboutBLD03-216f,.,, J Waterman & ICalz Building 161 Quincy Street, Butte 301 Port Toxveead, WA 96368 Phone:360.379-5066 Fax 360.3857675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO3-21 f) Issued: 11/18/03 Parcel Number: 965 701 908 Job Address: 936 Benton Street Zoning: RR=II Type: VV=N Occupancy: R=3 Total Occupant Load: 1 Nature of Work: Enclose covered uorch, add two baths Owner: Jonathan & Deborah Bakin Contractor: Crain Johnson, CRAIGJL992N2 GENERAL CONDITIONS APPLY: See last ua2e SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.ni1TRF,n iNCPF,fTT()NS A PPR l1t7-Gil/~l A TTi TEMP EROSION & SEDIMENT CONTROL See Correction Notice in File See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOUNDATION See Correction Notice in File Grade beam Attachment to stemwall Forms Reinforcement Anchor Bolts & Washers Post to Foundation Wall Positive Connection Vents - 3 Required CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 Building Permit #SLD03-216 ""t REOUiRED iNSPF,( Ti(~NS euuunv~nm~m~ FLOOR FRAMING See Correction Notice in File " Girders Joists Blocking `•.` •`~` jj ~ . Post to Foundation Wall Connection Positive Connections ~ ~~ (~ ~ Treated Wood to Concrete ,, ' "" ' Anchor Bolts & Washers H ldd J-' ~ ~~ ~ ti 1~~ / o owns PLUMBING See Correction Notice in File Rough-In (D-V-T & Clean outs) Water Supply // ~ C/"~ Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if> 80 psi Water Heater R-10 under if electric (~1 Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate " " J 6 -24 above ground MECHANICAL See Correcti Notice in File Source Specific Exhaust Fans @ bathrooms (SOcfin), laundry room, (50 cfin) and kitchen (100 cfin) Environmental Air Exhaust ducting (w! backdraft dampers), insulation (R-4) and terminus (located 3' l from openings) ~ • Ca1148 hours before you dig for utility line locates ' 1-800-424-5555 Page 2 of 4 ~~ , Building Permit #BIA03-216 ~'^~~ " iT~`siaa^--"r~r^~ ~ ~_ APPR(1VFil/iIATF ~ .~ • • ING See Correc ~ once in Fidevv rescriptive & designed braced wall panel sheathing & ` nailing must be inspected prior to cover Floor ~ Walls Shear walls Shear Panel Blocking ~ Roof Attic access ,• Attic venting -ridge & eave `~~'%" ~ r ~ Posts, beams and headers ~ ~ ~` ~ Windows -escape ~. Windows -safety glazing j ;' J Window U-factor - 0.40 or better ~ ~ Door U-factor - 0.20 or better 'Skylight U-factor- 0.58 or better `? ' NFRC sticker must be on windows, doors c~ skylights / `' /' 'ttt time of,tns~ection / Air Seal ~ _ ____,-~ 4 ~' ~ ;~ _ _ _ _ Fireblocking ~ ~ /'~ W ather Resistive Barrier f ~ -~ _ .-- -` INSULATION See Correction Notice in File Floor (R-30 ) Walls (R-~ Cei mg -_, attic; R-30, vault) Baffles Vapor Barrier -paint DRYWALL NAILING See Correction Notice in File Walls Ceiling FINAL See Correction Notice in File Public Works Sign-off ~ , House Numbers - 5" numbers '~ ~ Plumbing ~ 1 Mechanical/Ileating .i _ Insulation Certificate Smoke Detectors Stairs, Decks & Landings „ ' Final -building Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 Building Permit kBLD03-216 "\ GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public • Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. S. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates • 1-800-424-5555 Page 4 of 4