Loading...
HomeMy WebLinkAboutBLD03-213Waterman & ICalz Building I81 Quincy street, 8ulte 301 Port TOwusmd, WA 98368 Phone: 360-379-3086 Fax 360-383-7675 U • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO3-213 Issued: 10/30/03 Parcel Number: 936 300 511 Job Address: 1238 Tremont Street Zoning: RR=II Type: VV=N Occupancy: R-3/IJl Total Occupant Load: 4/1 Nature of Work: Construct Sinele-family Dwelline with attached ¢ara¢e Owner: Jason Queen Contractor: Owner -See General Condition #1 GENERAL CONDITIONS APPLY: See last aa¢e SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF,nTTTRF,II TNSPR('TT(1NC A PPl?l1VL'Tm A TTi TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site ' i - FOOTINGS Setbacks Footings , Forms Reinforcement Interior Footings Porch footings LIFER r-- FOUNDATION _ Stem Wall Forms Reinforcement ~, Simpson Strong Wall at Garage • > r Pier Footing to Post Positive Connection ~` Beam Pocket to Girder Beam Positive Connection f ~ '- Holddowns Vents - 7 Required ~~ CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 5 ~~ ~ ~. ~ Building Permit il03-213 REOUIRF,D iNSPF,CTi[1NC ~uvun«rm ~ TT - -------- FLOOR FRAMING t'la aaw •LLlLC11 L` NOTE: Engineered LPI floor plan on-site and available to the Inspector at inspection time Girders Joists Blocking Post to Girder Beam Positive Connections /,, Beam Pocket to Girder Beam Positive Connections- ~C/ pocket shall allow for minimum''/z" airspace at top, sides and ends Positive Connections jay" / Treated Wood to Concrete Anchor Bolts & Washers ~ n Holddowns t l ~ f/ \ TERIOR SHEATHING- inspection required --~_.,_ rior to cover ~ ~ ~ ) N E i i : ng neer ng or arc ttectural calculations to be onsite at time of inspection Braced wall panels Alternate Braced walls- if applicable (~ Engineered Shear walls- See engineering ar V architectural calculations 1 Blocking required (`/~` t PLUMBING Rough-In (D-V-T & Clean outs) Water Supply Gas Supply ~` Water Hammer Arrestors Hose Bibbs - backflow protection required Pipe Insulation (R-3) \ ,: Pressure Reduction Valve if> 80 psi l Water Heater f ~ R-10 under if electric Seismic Restraint - 2 places ,~'7 /1 ~ Pressure Relief Valve- drain to exterior, terminate y / 6" -24" above ground ~/ '1 .J Ca1148 hours before you dig for utility liue locates 1-800-424-5555 Page 2 of 5 Building Permit k03-213 REQUIRED INSPECTIONS • APPR(1VE1)/Il A TF MECHANICAL Forced Air Furnace Source Specific Exhaust Fans @ bathrooms (SOcfm), laundry room, (50 cfm) and kitchen (100 cfm) Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) Whole house fan -Integrated FRAMING Floor -Engineered BCI plan to be on site at inspection Simpson Strong Wall Design -Engineering design to be on site at time of inspection Walls Holddowns Roof -Engineered truss plan to be on-site at time of inspection Attic venting -ridge & eave Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - 0.40 or better Door U-factor - 0.20 or better NFRC sticker must be on windows, doors & skylights at time of inspection Air Seal Fireblocking Weather Resistive Barrier INSULATION Floor (R-30 ) Walls (R-~ Ceiling (R-38 attic; R-30 vault) Baffles ; ~ , - Vapor Barrier -paint DRYWALL NAILING Walls ~) ~. Ceiling ~ l 1 ;:_, Garage/house separation ~i -~ ~'_-, f • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 5 Building Pem~it k03-213 FINAL Public Works Sign-off House Numbers - 5" numbers Plumbing f'R~~-T o,.~ 1-~-tS cortPe.r~-r~D LPG -Manometer gauge test for Final Q ~ ~ ~~~ Gas Fireplace -Manufacturers Installation Manual Mechanical/Heating -Ventilation Certifuation for Forced Air System Insulation Certificate Smoke Detectors Stairs, Decks & Landings Final - buildin GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be .permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works anaroval must be received prior to scheduling the Buildine Deaartment's final insuection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 5 • n U Building Permit N03-213 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one • inspection-per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 5 of 5