Permit Number: BLDO3-211 Issued: 10/10/03 Parcel Number: 965 702 602
Job Address: 710 Cass St.
Zoning: R_II Type: VV=N Occupancy: R-3
Total Occupant Load: No Chance
Owners: Jonathan Lanedon
Nature of Work: Construct 70 sa. ft, deck, stairs and railines, and new
3'0" x 6'8" door.
Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTinNS
APPRf1VF.lfImATF
FOOTINGS ------- - - ----
Setbacks
peck Pier Footings J ~ ``~ [1" ~ ~
t ~ .~-/ .
~
R
i
f ~ C
orcement
e
n ~ (
~ i~
FLOOR FRAMING/DECK
All framing members to be pressure treated or wood of ,
natural resistance to decay
Posts
Beam
Joists (2" x 6") l
~~
Positive Connection
Post-to-Pier ~
Post-to-Beam ~
Treated Wood to Concrete
Lag Bolts @ ledger - 3/8" x 4" lag screws @ 12" o.c.
~
~
Blocking '`
DRYWALL NAILING
ADU/Garage Occupancy Separation under floor of ADU
FINAL
House Numbers posted (minimum 5")
Landing & Threshold (Max. 1 ") \
~ , \
Z [---
Guardrails
.Handrails 4
Stairs ,~
Smoke Detectors throughout existing wnstruction per 1997 'J
UBC
Building -Final
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page 1 of 2
Pmmt # BLDU3-211
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration •
number and a City business license. Failure to provide proof of this documentation prior to work may
result In job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt debris. Soils
exposed daring construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, 6oldowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is reauired Public Works auuroval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if na progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST TffiS PERMIT ON-SITE WITH THE APPROVED PLANS..
Ca1148 hours before you dig utility line locates: 1-800-424-5555