HomeMy WebLinkAboutBLD03-210Building and Community Development
Waterman & Katz Building
181 Quincy Street Suite 30l
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO3-210 Issued: 09/23/03 Parcel Number: 955 900 013
Owner/Contractor: Hamilton Heiehts LLC Installer: Kozeliskv's Home Services - WAINS0626
Job Address: Lot 13; 2234 Rainier Street Zoning: PUD Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 4/1 Nature of Work: Set Manufactured Home with attached site-built earaee
and deck.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
***Hours of Construction are limited to 7:30 a.m. to 6:00 p.m. Monday through
Friday and prohibited on weekends and national holidays***
REQUIRED INSPECTIONS
A PPR OVF.iI/Il A TF.
TEMPORARY EROSION & SEDIMENT
CONTROL
See details attached to MIP03-116 and general
condition #2
Silt Fence
Drive Off Mat
SLASICONCRETE
Setbacks ~_
v
,
- --°- - ~~ .
f ~o~ ~°` ~`~`t ~~'
> >
"
~'~
anolithic Sl~~ oundation (gazage)
I ~ ,o ~
)
~-
~^
-'~'
tem orcement - --._ _ __ _
~Anclior $olts _ _ . ;
Deck Piers
Alternate Braced Wal] Panel Holdown Hazdwaze
LIFER
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Perndt # BLD03-210
REOUiRF.n TNCPF.f TT(11VC A DDDn\7r+rm ~ mr,
--
PLUMBING (prior to skirting) t\i l l\V ~ L' L/1/L'11 L'
Water Supply-Main shut-off valve (port or ball valve) ~,
installed in water supply piping prior to connection to home,
min. %a "diameter, same as supply pipe
Hose Bibs (backflow protection required)
Pipe Insulation -Outside & in crawl space
Pressure Test -100 ps.i, for IS minutes
Pressure relief valve drain - to exterior ofskirting, exhaust
downward between 6"and 24"above ground
Drainage Piping -sloped min. '/, "per foot
MECHANICAL (prior to skirting)
Ducts & Duct Insulation
Dryer Exhaust -vented to outside. Extension into crawl space
requires venting through skirting with no dips; follow dryer
manufacturer's instructions; total combined length of ducting
not to exceed 14' w/2-90° elbows
FLOOR FRAMING (prior to skirting)
Anchors
Steel Support Piers -Load-stamped and installed per
manufacturer's installation manual; clearance of 18"min. from
lowest point of7--beam and the ground or footing for min. of ,
75% of area under home w/ I2"min. elsewhere unless
installation manual specifzes; otherwise area around home
graded to provide runoff away from home.
FRAMING:
Engineered roof truss plan to be on-site at time of inspection
Walls
Alternate Braced Wall Panels -Nailing inspection required
prior to cover.
Header
Roof
Gazage/House Attachment
DRY WALL NAILING
Gazage/House Occupancy Separation with 20 minute
self-closing door
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 4
Permit p BLD03-210
FINAL
Public Works Sign-Off
Electrical (L & I) Sign-Off
House Number -minimum 5" numbers
Plumbing
Mechanical
Deck
Pressure-Treated Framing
Positive Connections
Final -Building
No holes or gaps greater than `/<" allowed
in skirting. Skirting to be rated for contact with
earth if backfild is involved.
Crawl space ventilation per installation
manual @ 1 sq. ft./1 SO sq. ft. (12 required);
located close to corners, on at least two
opposing sides for cross ventilation.
Crawl space access must provide access to
all areas under home; minimum 18"x 24"
unless specifed otherwise; covered with vinyl,
pressure-treated wood or metal.
•
'%
i -
t
Li _
/,
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
re¢istration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Permit # BLD03-210
6. The Building Department is unable to pass final inspection on your protect until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to •
scheduling the Building Department's final inspection.
7. Final Inspections and Cert~cate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department 379-3208 prior to making changes to the approved plans.
10. POST THIS PERNIIT ON-SITE WITH THE APPROVED PLANS.
U
Call 48 hours before you dig For utility line locates
1-800-424-5555
Page 4 of 4