HomeMy WebLinkAboutBLD03-209Waterman & Kate 6ueding
I81 Qdacy Street, Sane 301
Port T°wasead, WA 98368
Ptwae: (J60) 379-3208 Faa: (360) 385-7675
~_ J
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-209 Issued: 09/05/03 Parcel Number: 933 200 013
Job Address: 1120 Garfield Street Zoning: RR=II Type: VV=N Occupancy: RR=3
Nature of Work: Remove existing cedar roofing on house: install sheeting felt and composition
shingles, and provide adequate ventilation.
Owners: Bonnie & Scott Stenehiem Contractor: Affordable Services -AFFORDS*06503
NOTE: Roofing materials to be installed per manufacturer's specifications and UBC Chapter 15.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTinNS
4ppunvl,,nmsTla
DEMOLITION Y/ Y( 111J
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with
all local, state and federal laws.
SHEATHING
Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or
1 '/a" staples @ 6" o.c. edges and field.
ROOF VENTING
Ridge and Soffit Venting
Net free ventilation area shall not be less than 1 square
foot per 150 square feet of the area of the space
ventilated, unless 50% of the required vent opening
azea is provided in the upper portion of the roof and
therefore the rate may be reduced to 1 square foot of
venting to 300 square feet of area vented. Openings
shall be covered with corrosion resistant 1/<" mesh.
ROOFING
Install all roofing material
CaII 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pemut #BLD03-209
FINAL
Smoke detectors required per 1997 UBC (battery
powered OK)
House Numbers - 5" numbers of contrasting color
posted near main entrance of house and visible from
street per City Ordinance
Final -Building
ENERAL CONDTI'IONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. If temporary erosion and sediment control (T'ESC) measures are required, they shall be installed on-
site and inspected prior to beginning construction; ca11 3 85-2 2 94. Measares shall include installation
of silt fencing and graveled constriction entrance (see attached details). Adjacent rights-of--way shall
be kept free of dirt debris. Suits exposed during construction shall be temporarily stabilized with
mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding,
etc. once construction is complete. Applicant is responsible for protection of adjacent properties.
i
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correMion of any and all deficiencies noted by
required inspections.
5. Re-inspection is regaired after inspection report correMions are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A_
min-mum of twenty-four boars notice is reauired Public Works approval must be received prior to
scheduhnQ the Build~n¢ Department's final insnection
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Cali 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2