CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-205 Issued: 09/25/03 Parcel Number: 955 900 005
Job Address: 2388 Rainier Street Zoning: PUD Type: VV=N Occupancy: R-3/U-1
Total Occupant Load: 4/2 Nature of Work:_Construct Single-family Dwelling
with attached earaae in Hamilton Heiehts
Owner: David Graham Contractor: Ron Melheim Construction - RONMEC*9440L
GENERAL CONDITIONS APPLY: See last ua¢e
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
REOUTRF.D TNSPFCTTnNS
s vnu nv»~n m A mc~
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
~
~
~~ ~ ~~
Setbacks ~
"
Footings
Forms
Reinforcement
Interior Footings _
~-+-. ~~r ~f L ~ ~ y
Porch f ._. n __ ~__ _ _ ___.~._. __
UFEl~~
FOUNDATION
Stem Wall
Forms
~
Reinforcement ~ •
`
Anchor Bolts & Washers ,D ~
y
Post to Foundafion Wall Positive Connection ~
}~
Holddowns ~ ~~ i S ~ tij'
Vents - I1 Required
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
Building Permit #03-205
RE UIRED INSPECTIONS APPROVED/D
FLOOR FRAMING ATE
NOTE: Engineered BCI floor plan on-site and
available to the Inspector at inspection time
Girders
Joists
Blocking /~
Post to Foundation Wall Connection
Positive Connections
Treated Wood to Concrete ~
Anchor Bolts & Washers
Holddowns
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestors
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL
Source Specific Exhaust Fans @ bathrooms (SOcfin),
laundry room, (50 cfm) and kitchen (100 cfm)
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from openings)
Whole house fan -Laundry
n
•
Call 48 hours before you dig for utility line locates •
1-800-424-5555
Page 2 of 4
Building Persnit #03-205
REQUIRED iNSPF.('Ti(lN~ - -svvur~~nm n~m>~
~(
FRAMING
F~oor_- Engineered BCI plan to be on site at inspection
Walls --
_
______= r
---
ar walls -18"Panels ~ lCn rt ~/ C -J ~~,
Shear Panel~Iock'>`ng _---- _
Roof
~~
Attic venting -ridge & eave ~ _ _ ~,
Posts, beams and headers -
Windows -escape ~
Windows -safety glazing ~"
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better
Skylight U-factor - 0.58 or better
NFRC sticker must be on windows, doors & skylights t'i
at time of inspection
Air Seal
Fresh Air Intake -window ports .~
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R-30 )
Walls (R-21~ -_
Ceiling (R-38, attic; R-30, vault) r- '
Baffles _
Vapor Barrier -paint
DRYWALL NAILING
Walls -
Ceiling
Garage House Occupancy Separation ,
FINAL
Public Works Sign-off
House Numbers - 5" numbers
Plumbing ~ ~-
Mechanical/Heating
1
Insulation Certificate r
Smoke Detectors
Stairs, Decks & Landings '
Final -building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Building Permit k03-205
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries .
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required Public Works approval
must be received prior to scheduling the Buitding Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555