HomeMy WebLinkAboutBLD03-204Waterman & ICah BWlding
l81 QWnry Street, SWte 301
Port Towaeend, WA 983fi8
Phone: (360) 379.3208 Fax: (360) 3657675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO3-2O4 Issued: 09/03/03 Parcel Number: 965 701 801
Job Address: 1616 Garfield Street Zoning: RR=H Type: VV=N Occupancy: RR=3
Nature of Work: Remove existing cedar roofing on house: install sheeting felt and comaosition
shingles, and urovide adequate ventilation.
Owners: Cristine Rutledge & Eric Moe Contractor: Affordable Services -AFFORDS*06503
NOTE: Roofing materials to be installed per manufacturer's specifications and UBC Chapter 15.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE UIRED INSPECTIONS
C~
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with
all local, state and federal laws.
SHEATHING
Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or
1 3/<" staples @ 6" o.c. edges and field.
ROOF VENTING
Ridge and Soffit Venting
Net free ventilation area shall not be less than 1 square
foot per 150 squaze feet of the area of the space
ventilated, unless 50% of the required vent opening
area is provided in the upper portion of the roof and
therefore the rate maybe reduced to 1 squaze foot of
venfing to 300 squaze feet of area vented. Openings
shall be covered with corrosion resistant'/<" mesh.
ROOFING
Install all roofing material
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
r~~ae~,msaoa
FINAL -- - --
Smoke detectors required per 1997 UBC (battery
powered OK)
House Numbers - 5" numbers of contrasting color
posted near main entrance of house and visible from
street per City Ordinance
Final -Building
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down white this is accomplished.
2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-
site and inspected prior to beginning construction; ca11 3 85-2 294. Measures shall include installation
of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall
be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with
mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding,
etc. once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected: For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required Public Works aoarovat must be received prior to
scheduline the Building Deuartment's final insneMion.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH TIIE APPROVED PLANS.
Call 48 hours before you dig for utility lice -ocates •
1-800-424-5555
Page 2 of 2