HomeMy WebLinkAboutBLD03-203Waterman & Kah Building
181 Q,duty Street' Sdfe 301
Port Taxvre~M, WA 98368
Phoue: 360-379SOB6 Pax 360.3857675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO3-ZO3 Issued: 09/19/03 Parcel Number: 958 900 009
Job Address: 2021 E. Caroline Zoning: R-I Type: V=N Occupancy: R-3/Ul
Total Occupant Load: 6/2 Nature of Work: Construct Single-family Dwelline with
attached earaee
Owner: Jack & Marsha Hensel Contractor: Seven Brides Proaerties - SEVENBP983JD
GENERAL CONDITIONS APPLY: See last ua¢e
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
REQUIRED INSPECTIONS
APPR f)VFi)/il A TF
TEMP EROSION & SEDIMENT CONTROL See
General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks ,~1~
,j ~~ I ~-'~ ~ ~~~~~ ~
Footings
Forms
Reinforc;e~ent ~,._____T
Interior Footings ~ '--- --
Porch footi
n$s
'
UFER Y e .s
FOUNDATION
Stem Wall
Forms
Reinforcement ; r' ,
- rl~,~ -,
Anchor Bolts & Washers `~
Post to Foundation Wall Positive Connection
Holddowns
Vents -10 Required
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
Building Pemilt #03-203
REO><TiRF.n rNCPF.rTrnNC A DDD /~~ 7T. T m ,~ TT
FLOOR FRAMING
NOTE: Engineered LPI floor plan on-site and
available to the Inspector at inspection time
Girders
Joists
Blocking `~'
Post to Foundation Wall Connection ~ G .
Posifive Connections ~
~
Treated Wood to Concrete ~ ~; ~ 3
Anchor Bolts & Washers ~ J
Holddowns
---_. _
LUMBING
Rough-In (D-V-T & Clean outs)
Water Supply ,~------
Water Hammer Arrestors ~ '~ ~ ~~
H e Bibbs - backflow rotecti
Pipe Insulafion -3) i-""~ ----
Pressure Reducfion Valve if> 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL
Source Specific Exhaust Fans @ bathrooms (SOcfm),
laundry room, (50 cfin) and kitchen (100 cfin)
Environxnenta} Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from openings)
Whole house fan -Utility Room (Integrated)
Call 48 hours before you dig for utility line locates ~^ +~
1-800-424-5555
Page 2 of 4
i
U
•
REQUIRED INSPECTIONS
Building Permit #03-203
APPRnVF.TI/>1ATF.
FRAMING
Floor -Engineered LPI plan to be on site at inspection
Walls
Holddowns - -
,`
Sheaz walls ,
Sheaz Panel Blocking
Roof -Engineered truss plan to be on-site at time of
inspection
Attic venting - ridge & eave
Posts, beams and headers
Windows -escape
Windows -safety glazing
Window U-factor - 0.40 or better
Door U-factor - 0.20 or better
Skylight U-factor - 0.58 or better
NFRC sticker must be on windows, doors & skylights
at time of inspection
Air Seal
Fresh Air Intake -Window Ports
Fireblocking
Weather Resistive Barrier
INSULATION
Floor (R-30) ~ ~ > ~ -
Walls (R-~ ~ ~ ~ . : ~ "~
<~
Ceiling (R-38, attic; R-30, vault) ~ ~
° ' ,
; . ~,; ,~ z t ~ , ~- _ ~4,' ~ ;,.
`
~
Baffles , k
_ .
Vapor Barrier -paint
DRYWALL NAILING
Walls
Ceiling
Gazage/house separation '('
,
J
FINAL
Public Works Sign-off l_
House Numbers - 5" numbers q
~
Plumbing ;
tom'
LPG .0 1
~ ~
Mechanical/Heating -Ventilation Certification for ,~4
Integrated System i'
~
L , i t
Insulation Certificate ~
~ ~~ _
Smoke Detectors
Stairs, Decks & Landings
Final -building
Ca1148 hours before you dig for atility line locates
1-800-424-5555
Page 3 of 4
i
Building Pemrit N03-203
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of slit fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Bailding Department is unable to pass final inspection on your project until Public
Works requirements have been completed and iuspected. For Public Works inspection call
385-2294. A minimum of twenty-four Lours notice is required. Public Works aouroval
must be received urior to scheduling the Buildint Deaartment's final inspection
7. I•tinal Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress Las been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval arior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 Lours before you dig for utility line locates
1-800.424-5555
Page 4 of 4