HomeMy WebLinkAboutBLD03-201t
Waterman &. Kah Building
181 Quincy Stleet, Stite 301
Port Townsend, WA 98366
Plwne: (360)379-3208 Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO3-2O1 Issued: 09/26/03 Parcel Number: 957 902 205
Job Address: 2901 Cleveland Street Zoning: RR=II Type: VV=N Occupancy: UU=1
Total Occupant Load: 2 Nature of Work: Construct shoo and studio (Unheated)
Owners: Robert Baitineer & Cvnthia Spruill Contractor: Owner
•
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.nTiTRFn TNCPF.C'TTfINS
A PPR(1 VF.TI/Tl A TF.
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
Footings
Interior Footings
Forms
Reinforcement
UFER
Porch/Deck Piers
SLAB
Setbacks
Forms
Reinforcement - 6x6/10x10 wwf
Holdowns
lJ
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Pemut # BLD03-201
REQUIRED iNSPF["TT(1NC snvunv~nm s •rz,
FRAMING
Walls
Shear Walls
Holddowns
Ceilings
Posts, Beams & Headers Roof
Blocking
Roof Rafters
Roof Venting - eave and ridge vents
Windows -safety glazing
Windows Ufactor - .40 or better
NFRC window sticker must be on windows &
doors at inspection time
Fresh Air Intake (Window Ports)
Doors U-Factor - .20 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-30 )
Walls (R-21 )
Ceiling (R-30vault/R-38 attic )
Vapor Barrier: paint for walls and ceiling
Baffles
DRY WALL NAILING
Walls
Ceiling
FINAL
Public Works Sign-Off
Vapor Barrier Paint Certificate
Insulation Certificate
Final -Building
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Per~f # BLD03-201
GENERAL CONDITIONS
I. Contractors working on this project are required to Gave a Labor & Industries contractor's reeistration number and a
City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this
is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning
construction; ca11 3 85-2 2 94. Measures shall include installation of silt fencing and graveled construction entrance (see
attached details). Adjacent rights-of--way shall be kept free o[ dirt debris. Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacentproperties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require
inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been
completed and inspected. For Public Works inspection call 385-2294. A minimum of twenri-four hours noflce is required.
Public Works aoaroval must be received prior to scheduline the Buildin¢ Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project.
8. All building permits expire if no progress bas been made within six months, or if no inspections are done by the Building
• Department within one year. Call for at least one inspection per year to keep your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-
3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
• Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3