CITY OF-PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MU5T BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDU3-2~U Issued: 09/12/03 Parcel Number: 936 904 605
Job Address: 5821 Hill Place Zoning: R-II Type: V-N Occupancy: R-3
Total Occupant Load: No Change Nature of Work: Repair/Add to two existing decks, tota1446 sg. ft.
stairs and railings.
Owners: Don & Sherrill Bushell Contractor: Ravenswood Carpentry - RAVENC*07702
(360) 683-3441
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RE(1TTTRET) TN4PEC'.TTnN~
•
•
APPRnVED/DATE
FOOTINGS
Setbacks
Deck Pier Footings
Reinforcement
~ ~
-
{ ~
~~
FLOOR FRAMING/DECK
All framing members to be pressure treated or wood of
natural resistance to decay
Posts
Beam
Joists (2" x 8"@ 16" o.c. and 2" x 10" @ 16" o.c.) ~..
Positive Connection s .
Post-to-Pier
Post-to-Beam
Treated Wood to Concrete
Lag Bolts @ ledger - 1/4" x 4" lag screws @ 12" o.c.
Blocking
FINAL
House Numbers posted (minimum 5")
Guardrails
Handrails - /`
Stairs ~'
Landing
~ '
i
Safety Glazing ~ ` °'
Smoke Detectors throughout existing construction per 1997
UBC
Deck -Final
Ca1148 hours before you dig utility line locates: 1-800-424-5555
Page 1 of 2
Permit # BLD03-200
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is repaired Public Works approval must be received prior to
schedubng the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. .All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST TffiS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig utility line locates: 1-800-424-5555