Loading...
HomeMy WebLinkAboutBLD03-197 • • Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360.344-3057 Fax360-3857675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection CITY OF PORT TOWNSEND Permit Number: BLD03-197 Issued: 10/13/03 Parcel Number: 101 342 004 Job Address: 1042 Turtleback Road Zoning: R-I Type: V-N Occupancy: R=3 Total Occupant Load: No Change Nature of Work: Reuair fire damaged sunroom Owners: Hildt Trust Contractor: Townsend Builders Inc. - TOWNSBI088JA GENERAL CONDITIONS APPLY: See Last Page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RFOiTTRFD TNSPF('TTnNS APPRnVF.n/nATF, DEMOLITION Materials from demolition shall be taken to the Jefferson County Landfill or other approved off-site location meeting all state and local codes FRAMING Walls Ceiling/Roof -add 2" x 4" @ 24" o.c. @ ceiling portion under deck & repair as necessary under stairs '; ~ ,-' ;"• r.' " ;. -_ ~,' Window -safety glazing v Window U-factor:.40 or better Door U-factor:.20 or better Rafter Positive Connections Blocking _ _ _ Air Seal -. - .; Stairs - . _ ," ._ "a Handrails Rise & Run - _.._ Fireblacking -.- • ,_ _ - _._, _ ---~, ; 3 Weather Resistive Barrier • CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 3 Building Permit #03-197 REQUIRED INSPF.C'TInNC ~ vuu n~rcr m ,. -r~ - - - - - - - - - INSULATION Floor/Ceiling (R-~ Walls -fill cavi 'es between window framing if applicable a or arrier re u' • faced batts, ,paint, eta affles (if applicable) ---_._._._- ni 1 1~V • L` L/ Ltd 1 L' . , ~- ~~~~ ~_ r _ .__ _ - DRYWALL NAILING Walls , ~~~ Ceilings .. ~ b t` FINAL House Numbers - 5" numbers Handrails/Landings/Steps ,/ Insulation Certificate if applicable ~'~ ' " Vapor Barrier Paint Certificate if applicable , J Smoke Detectors throughout existing construction: one in each sleeping room and in area leading to sleeping rooms ~ ~ Final -building ,~ GENERAL CONDITIONS • 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected. prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's age>trt shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. Ca1148 hours before you dig for utility fine locates 1-800-424-5555 Page 2 of 3 Building Permit #03-197 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3