HomeMy WebLinkAboutBLD03-196Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-196 Issued: 10/01/03 Parcel Number: 991 100 016
Job Address: 237 Woodland Ave. Zoning: Rosewind PUD Type: V-N Occupancy: R-3
Total Occupant Load: 5 Nature of Work: Construct single-family residence.
Owners: Caroline Wildflower & Clinton Weimeister
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
Contractor: Blue Heron Construction -
BLUEHCC109D8
RF.nITIRF.n TN~PF,(''TT(lN~
•
A PPR (IVF,II/Tl 4 TF,
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks -- ~_~
Jy~. -"-'~~--.~
Footings
Interior Footings 'Q:
Forms C- J~
Reinforcement ~;~ . \ ' ~
U~F'ER
__
Porc eck Piers ._ ._
GROUNDWORK PLUMBING
Pressure Test
Pipe Joints Exposed
Pipe Bedding
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Permit # BI.D03-196
RFnTTTRF.TI TNCPF.(''TTnNC A DDD!'1~7T71m • T„
- ----
FOUNDATION iaa i i~V • LL/LA1L'
Stem Wall
Anchor Bolts
Holdowns -per engineer design
LAB ~'-~ .~ `r~ ~' 3
I
t
ti
g (]j~t~t,~,.k~ ~~~, c~~.i`~
n
o
n
s
Drain for LPG
Radiant tubing
Reinforcement
Holdowns -per engineer design
FLOOR FRAMING
NOTE: Engineered BCI floor plan on-site and
available to the Inspector at inspection time
Girders
Joists
Blocking
Post to Foundation Wall Connection
Positive Connections '
Treated Wood to Concrete j
Anchor Bolts & Washers J
Holddowns -per engineer design '~~
.Rough-In (D V-T & Clean outs) ~ ~_' ~ ~ ~ ~ ~ ~ ~~, ... '~~`
ater upp y ...
Gas Supply j' ~
Water Hammer Arrester @ clothes & dishwashers ~J
Hose Bibs (backflow protection required) f/
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric / ``~
Seismic Restraint -strap tank @ 1/3 points r
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
i
d
~~~
Ca1148 hours before you dig for utility hne locates
1-800-424-5555
Page 2 of 4
~ ,
~ Permit # BLD03-196
RE UIRED INSPECTIONS APPROV
•
~.
MECHANICAL ED/DATE
Whole House Fan @ bathroom -Max. 75 CFM
Kitchen/Bath/Laundry Fans
Environmental Air Exhaust ducting (w/ backdraft dampers),
msulatic~n (R-4) and terminus (locate 3' fr
i om openings)
. - ,
,.~, ' ~ ,
..
.r.~
._ __ ,,
.
-
_ ,
,
ING
Floors -NOTE: Engineered BCI floor plan orit-site and - - - ------ -
___.
__.
available to the Inspector at inspection time
....... - ... .
.._.
...
lls
Vti _.,
~-
.
'~- ~
a ~
(, -
Shear Walls -per engineer design ~- i.
~ _.l . _.'
` ~
r.- r' -- -
_ -He~ldaw~s_~-{tom engineer des~n
~~.
~....__ __
_
Ceilings ---- -..._ .. _.
Posts, Beams & Headers Roof -per architectural design
Blocking `~,
Roof Trusses r ';
Roof Venting - eave and ridge vents _
Windows -escape ~-
Windows -safety glazing ~~
Windows Ufactor - .40 or better ~
` '`
NFRC window sticker must be on windows &
doors at inspection time
Fresh Air Intake (Window Ports)
Doors U-Factor - .20 or better -
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-30) 1
~~
Walls (R-21) _ ~ ,
- '`
Ceiling (R-30vault/R-38 attic)
V
B --
~
'
apor
arrier: paint ~,
-
Baffles
DRY WALL NAILING ~
Walls ;
_ x
Ceiling
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Penmt # BLD03-196 ~ j
FINAL _-
Public Works Sign-Off
House Numbers - 5" minimum
Plumbing
LPG Final
Mechanical/Heating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building
~ $,~.~~
i
GENERAL ONDITION~
1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a
Citv business license. Failure to provide proof of this documentation prior to work may result in job shut down while this
is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning
construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see
attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall pagels (ABWP) re~
inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required. inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been
completed and inspected. For Public Works inspection Galt 385-2294. A minimum of twenty-four hours notice is required
Public Works anproval must be received prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building
Department within one year. Call for at least one inspection per year to keep your building permit active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-
3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
i
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4