Loading...
HomeMy WebLinkAboutBLD03-196Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 • CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-196 Issued: 10/01/03 Parcel Number: 991 100 016 Job Address: 237 Woodland Ave. Zoning: Rosewind PUD Type: V-N Occupancy: R-3 Total Occupant Load: 5 Nature of Work: Construct single-family residence. Owners: Caroline Wildflower & Clinton Weimeister GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 Contractor: Blue Heron Construction - BLUEHCC109D8 RF.nITIRF.n TN~PF,(''TT(lN~ • A PPR (IVF,II/Tl 4 TF, TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks -- ~_~ Jy~. -"-'~~--.~ Footings Interior Footings 'Q: Forms C- J~ Reinforcement ~;~ . \ ' ~ U~F'ER __ Porc eck Piers ._ ._ GROUNDWORK PLUMBING Pressure Test Pipe Joints Exposed Pipe Bedding Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Permit # BI.D03-196 RFnTTTRF.TI TNCPF.(''TTnNC A DDD!'1~7T71m • T„ - ---- FOUNDATION iaa i i~V • LL/LA1L' Stem Wall Anchor Bolts Holdowns -per engineer design LAB ~'-~ .~ `r~ ~' 3 I t ti g (]j~t~t,~,.k~ ~~~, c~~.i`~ n o n s Drain for LPG Radiant tubing Reinforcement Holdowns -per engineer design FLOOR FRAMING NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time Girders Joists Blocking Post to Foundation Wall Connection Positive Connections ' Treated Wood to Concrete j Anchor Bolts & Washers J Holddowns -per engineer design '~~ .Rough-In (D V-T & Clean outs) ~ ~_' ~ ~ ~ ~ ~ ~ ~~, ... '~~` ater upp y ... Gas Supply j' ~ Water Hammer Arrester @ clothes & dishwashers ~J Hose Bibs (backflow protection required) f/ Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater R-10 under if electric / ``~ Seismic Restraint -strap tank @ 1/3 points r Pressure relief valve drain to exterior, terminate 6" - 24" above ground i d ~~~ Ca1148 hours before you dig for utility hne locates 1-800-424-5555 Page 2 of 4 ~ , ~ Permit # BLD03-196 RE UIRED INSPECTIONS APPROV • ~. MECHANICAL ED/DATE Whole House Fan @ bathroom -Max. 75 CFM Kitchen/Bath/Laundry Fans Environmental Air Exhaust ducting (w/ backdraft dampers), msulatic~n (R-4) and terminus (locate 3' fr i om openings) . - , ,.~, ' ~ , .. .r.~ ._ __ ,, . - _ , , ING Floors -NOTE: Engineered BCI floor plan orit-site and - - - ------ - ___. __. available to the Inspector at inspection time ....... - ... . .._. ... lls Vti _., ~- . '~- ~ a ~ (, - Shear Walls -per engineer design ~- i. ~ _.l . _.' ` ~ r.- r' -- - _ -He~ldaw~s_~-{tom engineer des~n ~~. ~....__ __ _ Ceilings ---- -..._ .. _. Posts, Beams & Headers Roof -per architectural design Blocking `~, Roof Trusses r '; Roof Venting - eave and ridge vents _ Windows -escape ~- Windows -safety glazing ~~ Windows Ufactor - .40 or better ~ ` '` NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake (Window Ports) Doors U-Factor - .20 or better - Air Seal Fire Blocking Weather Resistive Barrier INSULATION Floor (R-30) 1 ~~ Walls (R-21) _ ~ , - '` Ceiling (R-30vault/R-38 attic) V B -- ~ ' apor arrier: paint ~, - Baffles DRY WALL NAILING ~ Walls ; _ x Ceiling • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Penmt # BLD03-196 ~ j FINAL _- Public Works Sign-Off House Numbers - 5" minimum Plumbing LPG Final Mechanical/Heating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final -Building ~ $,~.~~ i GENERAL ONDITION~ 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a Citv business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall pagels (ABWP) re~ inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required. inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection Galt 385-2294. A minimum of twenty-four hours notice is required Public Works anproval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379- 3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. i Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4