HomeMy WebLinkAboutBLD03-192
•
•
•
Waterman and Katz Building
181 Quincy Street Suite 301
Port Townsend, WA 98368
Phone (360) 379-3208 Fax (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-192 Issued: 09/18/03 Parcel Number: 988 800 403
Job Address: 740 Ouincy Street Zoning: R-II Type: V-N
Occupancy: RR=3 Total Occupant Load: No Change
Nature of Work: Interior remodel of kitchen and bathrooms; remove bearing walls in kitchen and living
room areas; remove non-bearing wall in upper bedroom and build new wall and closet• remove wood stove
and chimney, place new wood stove in corner of living room.
Owners: Bruce Stowe and Sandy Vanvig Contractor: Little & Little Construction - LITTKLLC157C5
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
REQUIRED INSPECTIONS
A PPR [1VF>n/ll A TF.
DEMOLITION
Materials from demolition shall be taken to the
Jefferson County Landfill or other approved off-
site location meeting all state and local codes
FOUNDATION WORK (Load Path Support)
Piers - (2) 1'6" x 1'6" x 8" for new 4" x 6" posts
under Living Room/Entry
Posts - (3) 4" x 4" anchored to existing foundation
under Living Room/Kitchen area
Positive Connections: PHD-2 base and Simpson
LCE4 postcap
PLUMBING
Rough-In (D-V-T & Clean Outs)
Water Supply
Pipe Insulation: R-3
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Building Permit #BLD03-192
REOUIRFD IN~PF(''TT(1NC s pnun«nm ~ m~
- - -
MECHANICAL i acv • ilL/ Lr~ i l'J
Woodstove
Bathrooms & Kitchen Fans
Environmental Air Exhaust ducting (with
backdraft dampers), insulation (R-4) and
terminus (located 3' from openings)
FRAMING
Point Loads
Positive Connections
Beams
3-1/2" x 11-7/8" Glu-Lam between Kitchen and
Living Room
" ~~ ~ , //!!
5-1/4
x 11-7/8" Glu-Lam between Living Room ~ ~~
and Entry ~ ~, / / ~/ o~ L
°"~ / ~
Walls - 2 x 4 ~ L~
Ceiling (if applicable) /} ,r Vk
° ~/
Air Seal
Fire Blocking '~ '~
J
INSULATION (all interior walls)
Walls (R-21) if applicable
Ceiling (R-38) if applicable
DRYWALL NAILING
~
Walls f ~ ~ l `~
~~
~
Ceilm if a licable t 6
g ( pp )
FINAL
Smoke Detectors throughout existing construction
per 1997 UBC; battery powered okay l~~
~ /
f
House Numbers -check for 5"
Plumbing ~
f
~
Mechanical
Final -Building
_ ~ l ~ (~/
l
i`
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Building Permit #BLD03-192
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt
and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department at 379-5086 rior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3