Loading...
HomeMy WebLinkAboutBLD03-192 • • • Waterman and Katz Building 181 Quincy Street Suite 301 Port Townsend, WA 98368 Phone (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-192 Issued: 09/18/03 Parcel Number: 988 800 403 Job Address: 740 Ouincy Street Zoning: R-II Type: V-N Occupancy: RR=3 Total Occupant Load: No Change Nature of Work: Interior remodel of kitchen and bathrooms; remove bearing walls in kitchen and living room areas; remove non-bearing wall in upper bedroom and build new wall and closet• remove wood stove and chimney, place new wood stove in corner of living room. Owners: Bruce Stowe and Sandy Vanvig Contractor: Little & Little Construction - LITTKLLC157C5 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REQUIRED INSPECTIONS A PPR [1VF>n/ll A TF. DEMOLITION Materials from demolition shall be taken to the Jefferson County Landfill or other approved off- site location meeting all state and local codes FOUNDATION WORK (Load Path Support) Piers - (2) 1'6" x 1'6" x 8" for new 4" x 6" posts under Living Room/Entry Posts - (3) 4" x 4" anchored to existing foundation under Living Room/Kitchen area Positive Connections: PHD-2 base and Simpson LCE4 postcap PLUMBING Rough-In (D-V-T & Clean Outs) Water Supply Pipe Insulation: R-3 Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Building Permit #BLD03-192 REOUIRFD IN~PF(''TT(1NC s pnun«nm ~ m~ - - - MECHANICAL i acv • ilL/ Lr~ i l'J Woodstove Bathrooms & Kitchen Fans Environmental Air Exhaust ducting (with backdraft dampers), insulation (R-4) and terminus (located 3' from openings) FRAMING Point Loads Positive Connections Beams 3-1/2" x 11-7/8" Glu-Lam between Kitchen and Living Room " ~~ ~ , //!! 5-1/4 x 11-7/8" Glu-Lam between Living Room ~ ~~ and Entry ~ ~, / / ~/ o~ L °"~ / ~ Walls - 2 x 4 ~ L~ Ceiling (if applicable) /} ,r Vk ° ~/ Air Seal Fire Blocking '~ '~ J INSULATION (all interior walls) Walls (R-21) if applicable Ceiling (R-38) if applicable DRYWALL NAILING ~ Walls f ~ ~ l `~ ~~ ~ Ceilm if a licable t 6 g ( pp ) FINAL Smoke Detectors throughout existing construction per 1997 UBC; battery powered okay l~~ ~ / f House Numbers -check for 5" Plumbing ~ f ~ Mechanical Final -Building _ ~ l ~ (~/ l i` • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Building Permit #BLD03-192 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of way shall be kept free of dirt and debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 rior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3