HomeMy WebLinkAboutBLD03-190City of Port Townsend
Waterman & Katz Building
181 Quincy Street, Port Townsend, WA 98368
(360) 344-3057 Fax (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-190 Issued: 08/13/03 Parcel Number: 101 341 014
Job Address: 940 Lawrence Street Zoning: C-IIIH Type: V-N Total Occupant Load: N/A
Occupancy: N/A Nature of Work: Construct aerimeter fence around burn site
Owners: Retail Service, Inc. dba Aldrich's Contractor: Belfor BELFOUG990BJ
(206) 409-8710 (Steve)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
U 1Kta 1N ~Y~; C;'1'lUN 5
FRAMING
Wall
Sheathing
Positive Connections
Bracing
OVED/DATE
__ ,~-t -
.,
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include installation of
silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way
shall be kept free of dirt debris. Soils exposed during construction shall be temporarily
stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for
protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit # BLD03-190
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294.
A minimum of twenty-four hours notice is reauired Public Works approval must be received
prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
i
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2