Loading...
HomeMy WebLinkAboutBLD03-190City of Port Townsend Waterman & Katz Building 181 Quincy Street, Port Townsend, WA 98368 (360) 344-3057 Fax (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-190 Issued: 08/13/03 Parcel Number: 101 341 014 Job Address: 940 Lawrence Street Zoning: C-IIIH Type: V-N Total Occupant Load: N/A Occupancy: N/A Nature of Work: Construct aerimeter fence around burn site Owners: Retail Service, Inc. dba Aldrich's Contractor: Belfor BELFOUG990BJ (206) 409-8710 (Steve) GENERAL CONDITIONS APPLY -SEE LAST PAGE U 1Kta 1N ~Y~; C;'1'lUN 5 FRAMING Wall Sheathing Positive Connections Bracing OVED/DATE __ ,~-t - ., GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit # BLD03-190 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is reauired Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. i Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2