Loading...
HomeMy WebLinkAboutBLD03-189 Watem~an & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection CITY OF PORT TOWNSEND Permit Number: BLD03-189 Issued: 09/03/03 Parcel Number: 968 500 106 Job Address: 4224 Hill Street Zoning: R-II Type: V-N Occupancy: R-1 Total Occupant Load: 3 each auartment Nature of Work: Construct Four-nlex auartment Owners: Helen Arnold Contractor: Camubell Construction - CAMPBC111LR GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 .NOTE: All elements of engineering require inspection prior to cover RF.nTTTRFT) TNCPFf TT(lNC A pA1?l1VTil /il A TLS - - - - TEMP EROSION & SEDIMENT CONTROL ~ ~. See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings ' ~ ~ -''~~~~~ ~ ~' ~ ~ ~ Forms f 1 Reinforcement .- __.~____ --T ~ "~ ~ -.___- ~ - - _ - -- --- Inte on r ooh t g ~,,, ~~.- _-_ _____.a._.~__.~_____._._.. _ - _ ..~... __.__ Porch7IIec c hers ~--- ~ ~ t p 6, d,__~___.--~ --~ - '~ LIFER ~,~'` -' ,(,, u 1 ~~ ~k • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pemrit # BLD03-189 REnTTiRF,n rNCPF.f~~rTnlvc ~ uu~r,«rm ,. mz• -- - ---- <11 FOUNDATION 1 1~V • JJL/LAl1J Stem Wall ~ ~ l~ql~ Forms l C Reinforcement Anchor Bolts & BP washers ents -10 required at each unit Crawl Access FLOOR FRAMING Joists -engineered BCI plan shall be on-site at time of inspection Blocking ~ (~,/ ~ 3 Positive Connections ((( Treated Wood to Concrete Anchor Bolts & Washers Post to Foundation Wall Connection Knee wall between units for draft stop PLUMBING: Rough-In ~-V-T & Clean outs) Water Supply Water Hammer Arrester @ clothes & dishwashers Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater R-10 under Seismic Restraint -strap tank @ 1/3 points 18" A. F. F. Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL Whole House Fan @ Bath All penetrations at 1 hour separation between units to be in 1 Hour shafts. Inspect prior to covering Source Specific Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) Call 48 hours before you dig for utility line locates 1-800.424-5555 i Page 2 of 4 m_.,....... ... _.._..- ...~._~.. _„M...... u~nl,~~~RED INSPECTIONS __ ,FRAivitl~ u Wads -one hour wall separation foundation to roof deck between DU Doors -All room entry doors 32"net Draft stops in with walls separating units Ceilings Roof -Engineered truss plan to be on site at inspection Blocking Truss Positive Connections Roof Venting - eave and gable vents Windows -escape Windows -safety glazing Windows Ufactor - .40 or better for unlimited glazing NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake (window ports) Doors U-Factor - .20 or better/Rated doors @ garage/house Air Seal Fire Blocking Weather Resistive Barrier INSULATION ,,:= `~ Floor (R-30) ~.-~`' -_ -- C~~ling (R-38 ) apor Barrier: paint 6 mil black poly DRY WALL NAILING One- hour between dwelling units at floor ceiling assemblies and storage Interior braced wall panels as noted Walls Ceiling Garage/House Occupancy Separation ;4 PRO VED/~ .., ~ ,, . '~ FINAL Public Works Sign-Off House Numbers - 5" minimum Stairs and rails Ramp entry at ground floor units per WAC 51-30 Plumbing Mechanical/Heating Vapor Barrier Paint Certificate Insulation Certificate moke Detectors - ~~„~l - Rnilrlinu Permit l1 BLD03-189 TE f ~; - Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Pemtit # BLD03-189 ~ GENE T, C'n1y1~ITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works auuroval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call far at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 14. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4