CITY OF PORT TOWNSEND
Watem~an & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)385-7675
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-1 gg Issued: 11/17/03 Parcel Number: 959 702 505
Job Address: 2045 31st Street Zoning: R-II Type: V-N Occupancy: R-3
Total Occupant Load: 3 Nature of Work: Construct sinEle-family residence.
Owners: Ron & Nancy Little Contractor: E McFadin Enterprises - MCFAE*98605
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RE UIRED INSPECTIONS
A PPR (1VF.il/11 A TF
TEMP EROSION & SEDIMENT COC
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
See Correction Notice in File
FOOTINGS See Correction Notice in File
Setbacks
Footings
Interior Footings
Forms
Reinforcement
LIFER
Porch/Deck Piers
GROUNDWORK PLUMBING See Correction Notice in File
Pressure Test
Pipe Joints Exposed
Pipe Bedding
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Perntit # BLD03-188 ~ -T
REQUIRED INSPFCrTr~N~ A PPRllv~nm ~ m~
SLAB
Setbacks
Forms
Reinforcement
Anchor Bolts
Holdowns
See Correction Notice in File
PLUMBING: See Correction Notice in File
Rough-In (D-V-T & Clean outs)
Water Supply
Gas Supply
Water Hammer Arrester @ clothes & dishwashers
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Water Heater
R-10 under if electric
Seismic Restraint -strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL See Correction Notice in File
Whole House Fan @ bathroom -Max. 75 CFM
Kitchen/Bath/LaundryFans
Environmental Air Exhaust ducting (w/ backdraft dampers),
insulation (R-4) and terminus (located 3' from openings)
_J
t
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
~J
Pemtit # BLD03-188
REOUTRFn TNRPF.f'T><(1NC A nnunv~nm ~ m~
L'
FRAMING
Floors See Correction Notice in File
Walls
Shear Walls
Holddowns
Ceilings
Posts, Beams & Headers Roof
Blocking
Roof Rafters
Roof Venting - eave and ridge vents
Windows -escape
Windows -safety glazing
Windows Ufactor - .40 or better
NFRC window sticker must be on windows &
doors at inspection time
Fresh Air Intake (Window Ports)
Doors U-Factor - .20 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION See Correction Notice in File
Floor (R-30
Walls (R-21 )
Ceiling (R-30vault/R-38 attic )
Vapor Barrier: paint for walls and ceiling
Baffles
DRY WALL NAILING See Correction Notice in File
Walls
Ceiling
Enclosed Usable Space under Stairs
FINAL See Correction Notice in File
Public Works Sign-Off
House Numbers - 5" minimum
Plumbing
LPG Final
Mechanical/Heating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Perntit#BLD03-188 ~ ~,
GENE L CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning. construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required Public Works approval must be received prior to
scheduling the Building Department's final inspection -
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4