Loading...
HomeMy WebLinkAboutBLD03-188 CITY OF PORT TOWNSEND Watem~an & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-1 gg Issued: 11/17/03 Parcel Number: 959 702 505 Job Address: 2045 31st Street Zoning: R-II Type: V-N Occupancy: R-3 Total Occupant Load: 3 Nature of Work: Construct sinEle-family residence. Owners: Ron & Nancy Little Contractor: E McFadin Enterprises - MCFAE*98605 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RE UIRED INSPECTIONS A PPR (1VF.il/11 A TF TEMP EROSION & SEDIMENT COC TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site See Correction Notice in File FOOTINGS See Correction Notice in File Setbacks Footings Interior Footings Forms Reinforcement LIFER Porch/Deck Piers GROUNDWORK PLUMBING See Correction Notice in File Pressure Test Pipe Joints Exposed Pipe Bedding Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Perntit # BLD03-188 ~ -T REQUIRED INSPFCrTr~N~ A PPRllv~nm ~ m~ SLAB Setbacks Forms Reinforcement Anchor Bolts Holdowns See Correction Notice in File PLUMBING: See Correction Notice in File Rough-In (D-V-T & Clean outs) Water Supply Gas Supply Water Hammer Arrester @ clothes & dishwashers Hose Bibs (backflow protection required) Pipe Insulation (R-3) Water Heater R-10 under if electric Seismic Restraint -strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL See Correction Notice in File Whole House Fan @ bathroom -Max. 75 CFM Kitchen/Bath/LaundryFans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) _J t Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 ~J Pemtit # BLD03-188 REOUTRFn TNRPF.f'T><(1NC A nnunv~nm ~ m~ L' FRAMING Floors See Correction Notice in File Walls Shear Walls Holddowns Ceilings Posts, Beams & Headers Roof Blocking Roof Rafters Roof Venting - eave and ridge vents Windows -escape Windows -safety glazing Windows Ufactor - .40 or better NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake (Window Ports) Doors U-Factor - .20 or better Air Seal Fire Blocking Weather Resistive Barrier INSULATION See Correction Notice in File Floor (R-30 Walls (R-21 ) Ceiling (R-30vault/R-38 attic ) Vapor Barrier: paint for walls and ceiling Baffles DRY WALL NAILING See Correction Notice in File Walls Ceiling Enclosed Usable Space under Stairs FINAL See Correction Notice in File Public Works Sign-Off House Numbers - 5" minimum Plumbing LPG Final Mechanical/Heating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Perntit#BLD03-188 ~ ~, GENE L CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning. construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection - 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4