HomeMy WebLinkAboutBLD03-182Waterman & Katz Building
181 Quincy Street Suite 301
Port Townsend, WA 98368
Phone (360) 379-3208 Fax (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-182 Issued: 08/06/03 Parcel Number: 9892 714 207
Job Address: 650 Hudson Place Zoning: R-II Type: V-N Occupancy: R-3
Total Occupant Load: No Change Nature of Work: Replace existing deck and stairs
Owner: Jon and Laurel Shelton Contractor: Paradise Bay Design and Construction -
PARABDB141KW
731-4222 Bill Irwin
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.(1TTTRF,T) TN~PF.f'TT(1NC
r:
A PPR (l VF.Il/il A TF
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with all
local, state and federal laws.
FOOTINGS
Setbacks
Deck Pier Footings - 24" x 24" x 8" / , . ~ ~ ~
Reinforcement `~. !'~ i ~ ~ ~ ~' -~; ~`
~
Columns ,
Positive Connection
Reinforcement
Horizontal Ties
FLOOR FRAMING/DECK
All framing members to be pressure treated or wood of
natural resistance to decay
Posts
Beams
Joists
Positive Connection
Post-to-Pier
Post-to-Beam
Treated Wood to Concrete
Lag Bolts @ ledger - 1/28" x 4" lag screws @ 24" o.c.,
staggered 2" from top & bottom
Blocking
•
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page 1 of 2
Pemvt # BLD03-1S$-
FINAL
House Numbers posted (minimum 5")
Guardrails
Landings
Stairs
Handrails
Smoke Detectors throughout existing construction per 1997
UBC; one in each sleeping room with minimum one on
each floor.
Deck -Final
J~~
~~~
~ ~.
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction,• call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels •
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required Public Works approval must be received prior to
scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page 2 of 2