Loading...
HomeMy WebLinkAboutBLD03-181Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-181 Issued: 09/12/03 Parcel Number: 948 004 004 Job Address: 1530 31st Street Zoning: R-II Type: V-N Occupancy: RR=3 Nature of Work: Special Inspection for garage built in 1992/1993, now converted to bedroom, without a permit. Owners: Mike and Susan Donald Contractor: Unknown GENERAL CONDITIONS APPLY -SEE LAST PAGE RFnTTTRFD TN~PF,C'TTnNS • • APPRnVFD/DATE Foundation, Framing, and Insulation Covered prior to inspection. Photos provided to file. DRYWALL/NAILING (Can be done at same time as Final Inspection) FINAL I ~~ ~_ cv ~ a ~ y ,~ 0 ~ (~- ~ Change picture window to Escape Window ,, / _ Upgrade Smoke detectors per 1997 UBC (battery powered OK) House Numbers - 5" numbers of contrasting color osted near main entrance of house and visible from _ p ~ ~ ~ C C~ ~ ~.~ (l ~ ~ ~ O"~--- ~~~ r street per City Ordinance Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 1 ~ • ~ Permit #BLD03-181 ~ r ENEI[tAL CONDITIONS • 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on- site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any. and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is reauired Public Works approval must be received prior to scheduling the Building Department's final inspection • 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2