Loading...
HomeMy WebLinkAboutBLD03-177t Waterman & Katz Building 181 Quincy Street, Suite 301 • Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-177 Issued: 09/23/03 Parcel Number: 988 802 411 Job Address: 909 Roosevelt Street Zoning: R-II Type: V-N Occupancy: R-3 Nature of Work: Foundation wall. repair and installation of new footings. interior stemwall. and retainins? wall under existing residence. Occupant Load: No Change Owner: Ruth Gresslev Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE RFnITTRF.T) TN4PF(''TTnN4 C7 A PPR (1VFil/Il A TF TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 -install on-site as needed during construction to prevent sediment from leaving the site and to eliminate tracking of soil onto the street DEMOLITION All construction debris shall be deposited in the Jefferson County Landfill in accordance with. all state and local laws FOOTINGS Footings -Retaining wall Forms Reinforcement Interior footings FOUNDATION Remove and replace top course of masonry Add #4 verts at 16" o.c.- full height of wall Add 2 #4 horizontals for bond beam in masonry- continuous Solid grouting of masonry walls Reinforcement Positive Connection Treated Wood to Concrete- 2x6 & 2x8 Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 REQUIRED INSPECTInN~ Permit # BLD03-177 A PPR(1VTilm s TTi - -- - ---- FRAMING ~V • LY/LL111'J 2-2x8 DF#2's, bolted, nailed, and glued to existing beams Provide midspan support prior to connection Replacement of damaged framing 1/2" exterior plywood sheathing 5/8"interior CDX w/8d's @4" o.c. 1/2"x 10" AB's @ 36" o.c. Posts, Beams Solid blocking Cripple wall Venting FINAL House Number -check for 5" numbers Smoke Detectors throughout existing house per 1997 UBC Final -building a • GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior • to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works augroval must be received arior to scheduling the Building Department's final inspection. 7. Final Inspections. are required prior to occupancy; a Certificate of Occupancy is required fora non- - residential project. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 :~ Permit # BLD03-177 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. • 9. Revisions require submittal and a royal rior to m PP p along changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3