CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-177 Issued: 09/23/03 Parcel Number: 988 802 411
Job Address: 909 Roosevelt Street Zoning: R-II Type: V-N Occupancy: R-3
Nature of Work: Foundation wall. repair and installation of new footings. interior stemwall. and retainins?
wall under existing residence.
Occupant Load: No Change
Owner: Ruth Gresslev Contractor: Owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RFnITTRF.T) TN4PF(''TTnN4
C7
A PPR (1VFil/Il A TF
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2 -install on-site as needed during
construction to prevent sediment from leaving the site and to
eliminate tracking of soil onto the street
DEMOLITION
All construction debris shall be deposited in the Jefferson
County Landfill in accordance with. all state and local laws
FOOTINGS
Footings -Retaining wall
Forms
Reinforcement
Interior footings
FOUNDATION
Remove and replace top course of masonry
Add #4 verts at 16" o.c.- full height of wall
Add 2 #4 horizontals for bond beam in masonry- continuous
Solid grouting of masonry walls
Reinforcement
Positive Connection
Treated Wood to Concrete- 2x6 & 2x8
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
REQUIRED INSPECTInN~
Permit # BLD03-177
A PPR(1VTilm s TTi
- -- - ----
FRAMING ~V • LY/LL111'J
2-2x8 DF#2's, bolted, nailed, and glued to existing beams
Provide midspan support prior to connection
Replacement of damaged framing
1/2" exterior plywood sheathing
5/8"interior CDX w/8d's @4" o.c.
1/2"x 10" AB's @ 36" o.c.
Posts, Beams
Solid blocking
Cripple wall Venting
FINAL
House Number -check for 5" numbers
Smoke Detectors throughout existing house per 1997
UBC
Final -building
a
•
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior •
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works augroval must be received arior to
scheduling the Building Department's final inspection.
7. Final Inspections. are required prior to occupancy; a Certificate of Occupancy is required fora non-
- residential project.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
:~
Permit # BLD03-177
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
• 9. Revisions require submittal and a royal rior to m
PP p along changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
•