CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-176 Issued: 08/29/03 Parcel Number: 972 905 201
Job Address: 1120 57th Street Zoning: R-II Type: V-N Occupancy: R-3/LJ-1
Total Occupant Load: 8/2 Nature of Work: Construct Single-family Dwelling with
attached garage
Owner: Ronald Mahoney & Duane Dobrowits Contractor: Terhune Custom Homes
TERUCH984M9
GENERAL CONDITIONS APPLY: See last Wage
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RFniT><RF,n >(NSPF.(''T>((1NR
n pPU nvF.nm a TF.
TEMP EROSION & SEDIMENT CONTROL See
General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS -per engineer design ,~
,
Setbacks ~t.,~~ e~.~.~._u,~,A+~-~-rc~
Footings
~„~. f
~~~, ~~'" ,l
, , IC`'
`~~~
`
_~
y
~
-
Forms ~
- <
Reinforcement
Interior Footin s
w
Porch footings
-~--m- _._r_,._~_._.
OF R -..~.~.,R._.___- ._-- ----__ . -__-_
FOUNDATION
Stem Wall ~~
~ ~
Forms \
.>
Reinforcement >
Anchor Bolts & Washers (~
1
Post to Foundation Wall Positive Connection ,
~,,~
Holddowns -per engineer design , ~ '~
Vents -10 Required ; ~ , ~
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
E~ . 3
Building Permit #03-176
RE UIRED INSPECTIONS APPROVED/D
FLOOR FRAMING ATE
NOTE: Engineered LPI floor plan on-site and
available to the Inspector at inspection time
Girders
Joists
Blocking ~ /`
!`'
Post to Foundation Wall Connection
Positive Connections
Treated Wood to Concrete ~i
Anchor Bolts & Washers
~
Holddowns -per engineer design b3
}~ I Z1 ~
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestors
LPG Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL
LPG Furnace -provide specs on-site
Manufacturer's installation instructions to be on-site ~'
@ time of inspection.
Source Specific Exhaust Fans @ bathrooms (SOcfin),
~/
laundry room, (50 cfin) and kitchen (100 cfin)
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from openings) _
Whole house fan -Utility Room (Integrated)
FRAMING -framing per shear wall designations
Floor -Engineered LPI plan to be on site at
inspection
Walls
Holddowns -per engineer design
Shear walls -per engineer design
Shear Panel Blocking
FRAMING Continued on Next Pa e
r
Call 48 hours before you dig for utility line locates
1-800-424-5555 '
Page 2 of 4
Building Permit #03-176
RE UIRED INSPECTIONS APPROVED/DATE
FRAMING Continued
• Roof -Engineered truss plan to be on-site at time of
inspection ~` .
Attic venting -ridge & eave
Posts, beams and headers -per engineer design
Windows- escape
Windows -safety glazing
Window U-factor - 0.40 or better '
Door U-factor - 0.20 or better -
Skylight U-factor - 0.58 or better
NFRC sticker must be on windows, doors & skylights
at time of inspection ,~
Air Seal ~
Fresh Air Intake -Window Ports
Fireblocking ,
Weather Resistive Barrier
INSULATION
Floor (R-30 )
Walls (R-~
Ceiling (R-38, attic; R-30, vault)
Baffles
Vapor Barrier -paint
DRYWALL N
AILING
Walls "
Ceiling
Garage/house separation
DRAINAGE
All roof run-off to be captured and tightlined
a aY from bluff into wooded area
Call for Public Works Inspection - 385-2294
FINAL
Public Works Sign-off , fi'r' ` ~` ~ r
House Numbers - 5" numbers
Plumbing ,
~ ~ ~ v L` ~ .
LPG
MechanicaUHeating -Ventilation Certification for
> ' ' "
~ ~' ~ o' '
Integrated System ;
Insulation Certificate ~
~~ ,
~ ~~~ ~~ "'
Smoke Detectors ,
,
"
`
Stairs, Decks & Landings r
r
~ ~ = ~~~ ~ `` ,~ .~
Final -Building ~ r~ J.
;, --
•
- ~.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
'1
Building Permit #03-176
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's re istration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shutdown while this is accomplished,
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holddowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required Public Works approval
must be received prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval rior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4