Loading...
HomeMy WebLinkAboutBLD03-175M ,~ • • Building and Community Development Waterman & Katz Building 181 Quincy Street Suite 301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-175 Issued: 09/02/03 Parcel Number: 955 900 052 Owner/Contractor: Hamilton Heights LLC Installer: Kozelisky's Home Services - WAINS0626 Job Address: Lot 52; 2423 Highland Loop Zoning: PUD Type: V-N Occupancy: R-3/U-1 Total Occupant Load: 5/2 Nature of Work: Set Manufactured Home with attached site-built garage, and deck. GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 ***Hours of Construction are limited to 7:30 a.m, to 6:00 p.m. Monday through Friday and prohibited on weekends and national holidays*** RF.nTTTRF.T) TN~PF,(".TTnN~ TEMPORARY EROSION & SEDIMENT CONTROL - See details attached to MIP03-094 and general condition #2 Silt Fence Drive Off Mat ~ SLAB/CONCRETE r ~~,,~~ ; ~ ~~ ,~,~~ ~ ~ ,~., ~ ,.~ ~-+' R~ ~~ \ ~ ,.~; ~ ~~~" J ~~ Setbacks - - ~o - ' ` Forms ~" ---- -~-- ---___ ____ _ _ ~'~~ ,~`' ~7~.~~' Monolithic Slab/Foundation (garage) ~ I ~ ~' 3 Reinforcement Anchor Bolts `--~ ~----°~-~~` Deck Piers Alternate Braced Wall Panel Holdown Hardware LIFER N A PPR (IVFn/n A TF Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 r ' ~~~ z ' ?~. l Perrnit # BLD03-175 REOUTRF.n TN4PFf'TTn1VC A DDDl1VL~71m ~ m~ ~^ PLUMBING (prior to skirting) Water Supply -Main shut-off valve (port or ball valve) installed in water supply piping prior to connection to home, " ~ ~ ~~~p min. % diameter, same as supply pipe ~ Nose Bibs (backflow protection required) l~ ~1 Pipe Insulation -Outside & in crawl space 1 Pressure Test -100 p.s.i. for IS minutes Pressure relief valve drain - to exterior of skirting, exhaust downward between 6"and 24"above ground Drainage Piping -sloped min. //a "per foot-- • ~ i< Yy,l, ~ ~ ~2/o j MECHANICAL (prior to skirting) Ducts & Duct Insulation Dryer Exhaust -vented to outside. Extension into crawl space ~ ,~- requires venting through skirting with no dips; follow dryer ' ,~ manufacturer s instructions; total combined length of ducting not to exceed 14' w/ 2-90° elbows 1 ~ ~' 3 ~ 1 / FLOOR FRAMING (prior to skirting) Anchors Steel Support Piers -Load-stamped and installed per ' manufacturer s installation manual; clearance of 18"min. from ~ ~~ a 3 lowest point of I-beam and the ground or footing for min. of 75% of area under home w/ 12 "min. elsewhere unless installation manual specifies; otherwise area around home graded to provide runoff away from home. FRAMING: Engineered roof truss plan to be on-site at time of inspection Walls Alternate Braced Wall Panels -Nailing inspection required prior to cover. Header Roof Garage/House Attachment DRY WALL NAILING Garage/House Occupancy Separation with 20 minute self-closing door i • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 ,~ i ~~ U n U • Permit # BLD03-175 O FINAL Public Works Sign-Off Electrical (L & n Sign-Off House Number -minimum 5" numbers Plumbing Mechanical Deck Pressure-Treated Framing Positive Connections Final -Building No holes or gaps greater than '/4 "allowed in skirting. Skirting to be rated for contact with earth if backfill is involved.. Crawl space ventilation per installation manual @ 1 sq. ft./ISO sq. ft. (16 required); located close to corners, on at least two opposing sides for cross ventilation. Crawl space access must provide access to .all areas under home; minimum 18"x 24" unless specified otherwise; covered with vinyl, pressure-treated wood or metal. GENERAL CONDITIONS ~' i "~ /: i;' ;, 1 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 APPROVED/DA Permit # BLD03-175 ~, 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to • scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department 379-3208 prior to making changes to the approved plans. 10. POST TffiS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4