HomeMy WebLinkAboutBLD03-167R'
ti
Waterman & Katz Building
181 Quincy St., Suite 301
Port Townsend, WA 98368
Phone (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOViJNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-167 Issued: 07/22/03 Parcel Number: 989 705 603
Job Address: 835 Jefferson Street Zoning: C-III Occupancy: No Change
Type: No Change Total Occupant Load: No Change
Nature of Work: Repair and replace torchdown roof, add insulation as needed (see below).
Owner: Henry Nichols, DDS Contractor: Hope Roofing -ROPER*043N7
NOTE: all roofing materials to be installed per manufacturer's specifications and UBC Chapter 15
GENERAL CONDITIONS APPLY -SEE LAST PAGE .
DTl1TTi72T'i it TNCpF(''TT(1NC
A PPR ()VFn/n ATF
• PEDESTRIAN PROTECTION
Provide protection per UBC as needed during construction. See
attached handout including Table 33-A for type of protection
needed based on construction height and pedestrian distance
from construction.
SEDIMENT CONTROL
Rights of way shall be kept free of dirt and debris and swept as
needed during construction.
DEMOLITION
All construction debris to be deposited in Jefferson County
Landfill or other location in accordance with all local, state and
federal laws.
INSULATION
If: the roof sheeting is being replaced, the roof membrane is
removed, exterior insulation is removed, or no insulation exists,
the roof over a heated space must be insulated to the following
values:
Electric Heat: R-38 for roofs over attic, R-30 for other roofs
Other Fuels: R-30 for roofs over attic, R-21 for other roofs
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
RE UIRED INSPECTIONS
Permit #BLD03-167
APPROVEDlDATE
SHEATHING/NAILING (if applicable)
7/16" OSB requires 8d @ 6" o.c. edges & 12" field or 1 3/4"
staples @ 6" o.c. edges and field.
ROOF VENTING
1 sq. ft. for 150 sq. ft., or 1 sq, ft. for 300 sq. ft. if 50% of vents
are located at least 3 ft. above eave or cornice or a permanent
vapor barrier is installed on warm side of attic insulation.
ROOF DRAINAGE
Roof drains shall be sized and discharged in accordance with the
Uniform Plumbing Code. See attached pages from Appendix M
of the WA State Amendments of the UPC.
FINAL
Building Numbers - 5" numbers of contrasting color posted near
main entrance of building and visible from street
Final -Building
GENERAL CONDITIONS
r
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number. and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. If your project included he Building Department is unable to pass final inspection on your project
until Public Works requirements have been completed and inspected. For Public Works inspection
ca11385-2294.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project. ~,,;
Ca1148 hours before you dig for utility line locates ~~
1-80®-424-5555
Page 2 of 3
Permit #BLD03-167
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555