CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-161 Issued: 08/18/03 Parcel Number: 947 600 202
Job Address: 4154 Gise Street Zoning: R-I Type: V-N Occupancy: R-3
Total Occupant Load: 3 Nature of Work: Construct Loy Cabin as Single Family Residence
Owner: Ruth and David Whitney Contractor: Vern Garrison Construction - VERNOGC06208
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.nT1TRFn TN4PFf'TT(11VC s PpunvFnm ~ rr~
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
Footings
Deck Footings
Forms
Reinforcement
LIFER.
• Ca1148 hours before ou di for utili line locates
Y g tY
1-800-424-5555
Page 1 of 4
Permit # BLD03-161
REOUIRFD INfiPF.(''TT(1NC s npun~T~nm ~ m~
-- - - - - -
GROUNDWORK PLUMBING a a a_V • iJL/ Ltd 1 ^ •.
Pressure Test
Pipe Joints Exposed
Pipe Bedding
SLAB
Hydronic tubing .
Setbacks
Forms
Interior Footings
Anchor Bolts -per engineers design
Reinforcement - #3 @ 16" o.c. each way @ slab
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Gas Supply
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
Seismic Restraint -strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
MECHANICAL
Whole'House Fan -Bath
Source Specific Fans
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from opening)
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Pernrit # BLD03-161
REOUIRFn TN~PFf TT(1NC A uDDl1t7L~ilm ~ mr,
FRAMING:
Walls
Floors/Ceilings
Engineered Posts Beams & Headers
Roof
Rafters - Bolt at each rafter -per engineer design
Rafter -per engineer design
Roof Venting - eave and ridge vents
Baffles
Windows -escape
Windows -safety glazing
Windows Ufactor - .40 or better
NFRC window sticker must be on windows &
doors at inspection time
Fresh Air Intake (Window Ports)
Doors U-Factor - .20 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION -
Walls (R-10 on exterior for below grade walls)
Walls (R-21 )
Ceiling (R-30 vault )
Vapor Barrier: 4 mil plastic at roof
DRY WALL NAILING
Walls
Ceiling
FINAL
Public Works Sign-Off
House Numbers
Plumbing
Mechanical/Heating
Vapor Barrier Paint Certificate
Smoke Detectors
Final -Building
•
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 4
Permit # BLD03-161 -
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required Public Works approval mast be received prior to
scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•