HomeMy WebLinkAboutBLD03-160 C: • • Waterman & Katz Building 181 Quincy Street, Suite 30] Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection CITY OF PORT TOWNSEND Permit Number: BLD03-160 Issued: 09/09/03 .Parcel Number: 985 204 904 Job Address: 1001 U Street Zoning: R-II Type: V-N Occupancy: R-3 Total Occupant Load: 6 Nature of Work: Construct single-family residence. Owners: Michael & Clea Barenburg Contractor: Owner GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 REOTJTRET) TN~PF.(^'TTnN~ A PPR C1VFil/11 A TF. TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site ~ ` FOOTINGS Setbacks ' Footings -per architectural design ;~ , Interior Footings Forms Reinforcement _ ~ LIFER } Porch/Deck Piers ~ '' FOUNDATION Stem Wall Forms Reinforcement Anchor Bolts Retaining Wall -per architectural design Holdowns Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pemtit # BLD03-160 REQUIRED INSPECTInN~ a ppunvFr~m ~ /rte GROUNDW ItK ~~ , - c'' - Press T ''C- Pipe Joints Exposed °~ _..~._._..m Pipe Bedding SLAB Interior Footings Anchor Bolts PLUMBING: -In -V-T & Clean outs) ,~/ u o !~C '~ ' ~ '~~ ~/ Gas Supply Water Hammer Arrester @ clothes & dishwashers Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater R-10 under if electric Seismic Restraint -strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" - 24" above ground MECHANICAL LPG Stove -manufacturer's installation instructions shall be on-site at time of inspection. Whole House Fan @ @ upstairs bathroom -Max. 75 CFM Kitchen/Bath/Lauridry Fans Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) l~h, ~ie~~.-3,3i,c~ ~ l F`~`~at ~acQ f{~-' ~Z~f ZN ~ >~ .~. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 ~, ~' PECTI FRAMING Walls -Shear Walls -per architectural design Ceilings Posts, Beams & Headers -per architectural design Roof Ridge Beam -per architectural design Blocking Rafter Positive Connection - H1 Roof Venting - eave and ridge vents Windows -escape Windows -safety glazing Windows Ufactor - .40 or better NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake (Wall Ports) Doors U-Factor - .20 or better Air Seal Fire Blocking Weather Resistive Barrier INSULATION Floor (R-30 ) Walls (R-21 ) Ceiling (R-30 vault/R-38 attic ) Vapor Barrier: paint for walls and ceiling Baffles DRY WALL NAILING Walls Ceiling Enclosed Usable Space under Stairs • FINAL Public Works Sign-Off House Numbers - 5" rriinimum LPG Plumbing Mechanical/Heating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final -Building Perntit # BLD03-160 OVED/DATE ~_ _~ {. ,, ~. l .. ,~, (, ` - l '1 ', '~~ r. S ~` Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 4 Pemrit # BLD03-160 'i +~, GENERAL. CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (3'79-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4