CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360.379-5086 Fax 360.385-7675
CITY OF PORT TO~K~NSEND
n
Permit Number: BLD03-157 Issued: 08/25/03 Parcel Number: 933 301 701
Job Address: 131 47th Street Zoning: R-II Type: V-N Occupancy: R=3
Total Occupant Load: 5 Nature of Work: Construct Single-Family Dwelling
Owner: Kees & Marcia Prins Contractor: Owner
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RFnTTTRFT) TN~PF(~TTnN~
A PPR (1VFT)/T) A TF
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed -Drive Off Mat to restrict
sediment from leaving the site
FOOTINGS
Setbacks _
' ~
~
f -
, ;~
e~
~
,~
' ~
~ '~ ` ~ ,
Footings -
-
Forms
Reinforcement -__.-__...__ ___ ~_.,.--_.-
_
Interior Footings
Por_,- c~ ---
~-
FOUNDATION-
Stem Wall
Forms
Reinforcement
Anchor Bolts & Washers
Post to Foundation Wall Positive Connection
Holddowns -per architect's design
Vents - 7 Required
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 4
•
Building Permit#BLD03-157 ~'-
REQUIRED TNSPF.C''T>rnNC A DDDwr, T. m • mTa
-- - -
FLOOR FRAMING
NOTE: Engineered BCI floor plan on-site and
available to the Inspector at inspection time
Girders
Joists
Blocking
Post to Foundation Wall Connection
Positive Connections
Treated Wood to Concrete
Anchor Bolts & Washers
Holddowns -per architect's design tfiiAlJVL'L/LH1L'
~,
d
t p < < ~ ~ ~ 3
PLUMBING
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrestors
LPG Gas Supply
Hose Bibbs - backflow protection required
Pipe Insulation (R-3)
Pressure Reduction Valve if> 80 psi
Water Heater
R-10 under if electric
Seismic Restraint - 2 places
Pressure Relief Valve drain to exterior, terminate
6" -24" above ground
MECHANICAL
LPG Furnace - provide specs on-site
Manufacturer's installation instructions to be on-site
@ time of inspection.
Source Specific Exhaust Fans @ bathrooms (SOcfin),
laundry room, (50 cfin) and kitchen (100 cfin)
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3'
from openings)
Whale house fan -Upstairs bath
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Building Permit #BLD03-157
REQUIRED INSPECTIONS
U
•
A PPR ()VFn/n A TF
FRAMING
Floor -Engineered BCI plan to be on site at inspection
Walls.. _ ___ _
__
_
-Shear walls -per architect's design
l Bl
Sh
i ~ , . ~,. % ," t--- ~, r . __._.r_-
- _ . ~ .._
._~
r ~~
'
ear Pane
oc)~
~g __ ~__ __ _ _. _ ._ __..__
_ _~
~ ~
_ ,
<
.~.
Roof
Attic venting -ridge & eave ~~
Posts, beams and headers -per architect's design '
Windows -escape ~"
Windows -safety glazing
Window U-factor - 0.40 or better
~
Door U-factor - 0.20 or better ~
Skylight U-factor - 0.58 or better
/'
NFRC sticker must be on windows, doors & skylights ; '~'
at time of inspection
Air Seal ;
Fresh Air Intake -wall ports f
Fireblocking "
Weather Resistive Barrier
INSULATION
Floor_(R-3SZ,} __ _ _ _ _ _
'Walls (R-21)
Ceihn
(R-38
attic
R-30
vault) _ _ _ . .
- ~
` ~ ~.~'
g
,,
,
;
,
~
____..____ _.__ . _ ... _. . _
_ ;
~
___. _~.` _.-~
;Baffles
-
-- ,~- ~+_-- ~- ;:
__ ~,,...~. ;.__ _
~ _
Vapor Bamer -backed Batts ~~°~-- _- ~'
DRYWALL NAILING
Walls -, ,,--. ~-
Ceiling
One hour at usable space under stairs _ ''
FINAL
Public Works Sign-off
House Numbers - 5" numbers
Plumbing
LPG
MechanicaUHeating
Insulation Certificate
Smoke Detectors
Stairs, Decks & Landings
Final -building
Ca1148 hours before ou di for utili line locates
Y g tY
1-800-424-5555
Page 3 of 4
Building Permit #BLD03-157 ',
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The:Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works approval
must be received prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions. require review and approval rior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360-379-5086 Fax360-385-7675
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-157R-1 Issued: 09/16/03 Parcel Number: 933 301 701
Job Address: 131 47th Street Zoning: R-II Type: V-N Occupancy: RR=3
Total Occupant Load: No Change
Nature of Work: Revision #1: Engineering approval to delete second floor beam, and step
down stemwall.
Owner: Kees & Marcia Prins Contractor: Owner
GENERAL CONDITIONS APPLY: See last page
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
NOTE: See original permit BLD03-157 for other inspections.
REQUIRED INSPECTInN~
s ppu nvFn m ~ ~r~
FLOOR FRAMING
Cripple Wall Framing
~
Sheathing ''~~
~'~' -
~``
Nailing/Blocking -per shear wall specs when i
located beneath engineered shear walls
A
h
B
l ~'
~
}"
nc
or
o
ts -size and spacing per shear wall specs ~
ted under engineered shear walls
e ~ f , D
1~
Shear
Walls ;~
Holdowns -coupler nuts and threaded rod through
cripple wall and plate to stem wall
FRAMING
Headers and Beams
Delete aesthetic 6 x 12 beam (bearing wall below,
using standard headers)
FINAL
See original permit
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #BLD03-157R-1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's reEistration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
S. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is reauired Public Works approval
must be received prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
.inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making- changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
~'
Ca1148 hours before you dig for utility line locates
1-800-424-SS55
Page 2 of 2
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: 360-379-5086 Pax 360.3857675
•
•
•
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD03-157R-Z Issued: 10/22/03 Parcel Number: 933 301 701
Job Address: 131 471h Street Zoning: R-II Type: V-N Occupancy: R_3
Total Occupant Load: No Change
Nature of Work: Revision #2: Add 112 sp. ft. to enlarge upstairs studio room. bedroom and
laundry area.
Owner: Kees & Marcia Prins Contractor: Owner
GENERAL CONDITIONS APPLY: See last cage
SEPARATE PERMITS REOLTIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
NOTE: See also original permit BLD03-157 and BLD03-I57R-1 for additional inspections
REQUIRED INSPECTInNS
s PPR nvrnm s ~rF
- - -
FLOOR FRAMING ~// Ll 111.J
Cripple Wall Framing -see also original permit and plans
Anchor Bolts -embed 7/8"minimum bolts min. 10"with
// //
Holdowns: HDIOA at F-1; PHDB @ F-2 (@ F-2, ends
adjacent to window, connect to new 7/8"anchor bolt per
anchor bolt note above
FRAMING
Joists @ F-2 - F-2 joists carrying attic bearing walls
to be S l/4 " x 9 % "versa-lam 3080s
Beams & Headers -per plan and attached calculations
Dormer Ridge Beam -minimum DF #2 4"x 8"
Holdowns -per plan and structural talcs
Braced Wall Panels
Shear Walls -sheathing, blocking and nailing by design
Roof Diaphragm -sheathing, blocking and nailing by design
CALL 48 hours before you dig for Utility line locates
1-800-424-5555
Page 1 of 2
Building Permit #BLD03-157R-2
FINAL
See original permit
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works annrnval
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
City of Port Townsend
Building & Community Development
Waterman & Katz Building
181 Quincy Street
Port Townsend, WA 98368
(360) 379-3208 Fax: (360) 385-7576
CERTIFICATE OF OCCUPANCY
BLD03-157
Owners:
Address:
Location:
Building (or portion):
Use(s) permitted:
Kees and Marcia Prins
131 47`h Street
Port Townsend, WA 98368
Single Family Residence
R-3
The above-referenced building or portion complies with the applicable requirements of the Port
Townsend Building Code (PTMC 16.04), has passed all required inspections and may be used
and occupied in the use and manner indicated above.
This certificate of occupancy shall be posted in a conspicuous place on the premises and shall not
be removed except by the Building Official. '
Approved: Suzanne Wassmer October 22.2004
Permit Technician Date