Loading...
HomeMy WebLinkAboutBLD03-155f • Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-5086 Faz 360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-155 Issued: 08/08/03 Parcel Number: 965 702 902 Job Address: 1440 Lawrence Street Zoning: R-II Type: V-N Occupancy: R-3/U-1 Total Occupant Load: N/C Nature of Work: Seismic retrofit, demo, bath remodel, re-roof Owners: Richard Rackowski Contractor: Same as Owner GENERAL CONDITIONS APPLY: See Last Page SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF.if1TTTRF.TI TNCPFf''TrnNc A DDDllA7L~i1m A mn DEMOLITION Materials from demolition shall be taken to the Jefferson County Landfill or other approved off-site location meeting all state and local codes FOUNDATION Seismic Retrofit with Simpson Foundation Anchors ~. PLUMBING Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestors @ clothes & dishwashers Hose Bibbs - backflow protection required Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places Pressure Relief Valve drain to exterior, terminate 6" -24" above ground CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 3 Building Permit #03-155 REQUIRED IN~PF.f'TI[1NC A DDn ~l~ Tr, r m • mT, -- -- - - - MECHANICAL r tii r 1~V v L' L/LL's 1 L' New chimney for oil furnace Source Specific Exhaust Fan @ bathroom (SOcfm), (if no existing) Environmental air exhaust ducting (with backdraft damper), insulation (R-4) and terminus (3' from openings into building) FRAMING Walls CeilinglRoof Attic Venting ;' Air Seal Fireblocking INSULATION Fill any exposed exterior wall cavities Baffles at vented roof bays DRYWALL NAILING Walls ~ Ceilings ;~ a FINAL House Numbers - 5" numbers Smoke Detectors throughout existing construction: one in each sleeping room and area leading to each sleeping room Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. i 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 3 Building Permit #03-155 permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one • inspection per year to keep your building permit active. 9. Revis><ons require review and approval rior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3