Loading...
HomeMy WebLinkAboutBLD03-153Waterman & Katz Building 181 Quincy Street Suite 301 Port Townsend, WA 98368 Phone (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND PERMIT AND INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2626 for Inspection • s Permit Number BLD03-153 Issued 07/31/03 Parcel Number 989 800 001 Job Address 602 Howard Street Zoning M-C/C-II Occupancy M Nature of Work Install Fire Alarm System Use of Building Retail Owner Tacoma Goodwill contractor Allied Security - ALLIESV275BB ****e•_....u....L....J C:.•.. ~1.~..,~rfmnnt mmm~ rl~tnrl n7/~nm~ **** V ~iV M~iM VIIVV • •• v ~v w. ~ Site Inspection ••. ~..~ ... ~...~ ~~__ _ _ _ _ _ __ _ _ Inspec .~ a ~-~~-- Date ~~ ~-~~ -~ System Tests Inspect Date ~G~ 3 C~ ~ Contractor's Material & Test Certificate Inspector Date As-Built Plans filed with Owner & Plan Box Inspector na FACP (24 x 36 maximum format) Date Inspector Date Fire Department Final Inspection Approval Inspector Date Page 1 of 2 Permit # BLD03-153 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 3. Re-inspection is required after inspection report corrections are completed. 4. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 5. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 6. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 7. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 8. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Page 2 of 2