Loading...
HomeMy WebLinkAboutBLD03-152Waterman & Katz 18] Quincy Street Suite 301 Port Townsend, WA 98368 Phone (360) 379-3208 Fax (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-152 Issued: 07/21/03 Parcel Number: 948 312 203 Job Address: 1305 14th Street Zoning: R-II Type: V-N Occupancy: R-3 Total Occupant Load: No Change Nature of Work: Construct second floor deck and stairs; chanEe two windows on back side of house into doors. Owner: Doug Villers Contractor: E McFadin Enterprises - EMCFAE*986Q5 (360) 643-3425 GENERAL CONDITIONS APPLY -SEE LAST PAGE T?Fl1TTTl2FTl TNCPFf TT(1NC APPR(1VF'n/nATF, FOOTINGS Setbacks Deck Pier Footings - 2' x 2' x 7.5" Reinforcement - (2) #4 Each Way ~~ e F '~° '~~ ~ ~ 2 S ~ 03 ~ FLOOR FRAMING/DECK ~_ r ~~~ ~ K:':_ ~ ~: "; -' ''" 1 `~ ~ ~ ~ ~' All framing members and materials to be pressure treated or r~,~ `` - ,~ ' ' - ~ " ~ `-~' "- ~ - wood of natural resistance to decay Posts -Min. 4" x 4" Beams - 6" x 8"; 6" x 12" & 4" x 12" per attached calculations Engineered Floor Sheathing Joists - 2" x 8" @ 16" & 24" o.c. per engineering Blocking Cross Bracing Positive Connection Post-to-Pier -Simpson EPB Post-to-Beam -Simpson ACE/AC Treated Wood to Concrete Lag Bolts @ ledger -''/2" x 4" bolts @ 24" o.c., staggered 2" from Ledger top & bottom Doors U-factor- .20, or better r olid; .40 or better for glass T r FINAL House Numbers posted (min. 5") Stairs Guardrails f ,~, ps ; ~~ ~ ~ -~ ~=~~ ~~ ~ ~" Handrails Smoke Detectors throughout existing construction per 1997 UBC; one in each sleeping room with minimum one on each floor. Deck -Final Ca1148 hours before you dig utility line locates: 1-800-424-5555 Page 1 of 2 Permit # BLD03-152 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Ins ections are re aired rior to occu anc A Certificate of Occu anc is re aired for anon- P 9 P P Y~ P Y~ 9 residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig utility line locates: 1-800-424-5555 Page 2 of 2