Loading...
HomeMy WebLinkAboutBLD03-151 4 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Watettnan & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND Permit Number: BLD03-151 Issued: 09/19/03 Parcel Number: Treehouse PUD. Lot 2/3, Unit 9 Job Address: 1506 W Street Zoning: Treehouse PUD Type: V-N Occupancy: R-3 Total Occupant Load: 3 Nature of Work: Construct single-family residence. Owners: Madrona Village LLC Contractor: QED Builders LLC - OEDBUI*0431D1 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 Any work with equipment within the 10' buffer adjacent to San Juan Estates requires prior written approval from BCD Director. RF,(1TTTRFT) TN~PF(^'TT(lN~ • APPR(IVFT)/11ATF TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks ~.. Footings "~ ___ ~__ Interior Footings r ; '_, ~ , - ~ - ~ ~ Form's - , 1 ~ ~ -' ~ ` Reinforcement - ---- _ - - .__ _ __ LIFER ~ ,~ Porch/Deck Piers Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 re Permit # BLD03-151 REnITTRF,n TN~PF.[''TT(lNC A DDD n~T~ t~ m ~ m~ ~. FOUNDATION Stem Wall ~ ~ ~p 3 Forms Reinforcement Vents - 6 Required Anchor Bolts Ho downs PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrester @ clothes & dishwashers i Hose Bibs (backflow protection required) ~/ Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater R-10 under if electric Seismic Restraint -strap tank @ 1/3 points ;' Pressure relief valve drain to exterior, terminate 6" - 24" above ground _ ~. MECHANICAL / Whole House Fan @ upstairs bathroom -Max. 75 CFM f KitcheniBath/Laundry Fans /~~ Environmental Air Exhaust ducting (w/ backdraft dampers), t J insulation (R-4) and terminus (located 3' from openings) Call 48 hours before you dig for utility line locates 1-500-424-5555 Page 2 of 4 r 1 R_EQ-AIRED INSPECTIONS Pemtit # BLD03-151 APPRnVFn/nATF, FRAMING -- - - - - -- - - - -,~ ~ ~~- c C7 ~ - ~~-~ ~- V~alls , . Shear Walls -per architectural design.------ •-•. ~ _ _ ,_ _ . _ _ .._ ~, ~ ' ~ ~ ~ ~ ~' °3 ~ .~ ~~ •^ `a _ -- .-_. _ _ Ceilings •,, .- . Posts, Beams & Headers - Roof } Ridge Beam - ~ Blocking Rafter Positive Connection - H1 Roof Venting - eave and ridge vents Windows -escape Windows- safety glazing Windows Ufactor - .40 or better NFRC window sticker must be on windows & doors at inspection time Fresh Air Intake (Window Ports) Doors U-Factor - .20 or better Air Seal Fire Blocking Weather Resistive Barrier INSULATION f • Walls (R-21) _C~iling (R-~Qvault~ 38-.attic ) Vapo~Barrier:~~aint fer walls and ceiling Baffles DRY WALL NAILING Walls `~ ' Ceiling A Enclosed Usable- Space under Stairs , FINAL Public Works Sign-Off ~ • - Parking -1 space required s House Numbers - 5" minimum Plumbing Mechanical/Heating Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final -Building Ca1148 hours before. you dig for utility line locates 1-800-424-5555 Page 3 of 4 Permit # BLD03-151 GENERAL CONDITIONS .- 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number ana~ City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is reauired Public Works approval must be received prior to scheduling the Building Department's final inspection 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department _ 3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. '/_, r Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4