HomeMy WebLinkAboutBLD03-151
4
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Watettnan & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
Permit Number: BLD03-151 Issued: 09/19/03 Parcel Number: Treehouse PUD. Lot 2/3, Unit 9
Job Address: 1506 W Street Zoning: Treehouse PUD Type: V-N Occupancy: R-3
Total Occupant Load: 3 Nature of Work: Construct single-family residence.
Owners: Madrona Village LLC Contractor: QED Builders LLC - OEDBUI*0431D1
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
Any work with equipment within the 10' buffer adjacent to San Juan Estates requires prior written
approval from BCD Director.
RF,(1TTTRFT) TN~PF(^'TT(lN~
•
APPR(IVFT)/11ATF
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving
the site
FOOTINGS
Setbacks
~..
Footings "~
___
~__
Interior Footings r
; '_,
~
,
- ~ - ~ ~
Form's -
,
1
~ ~ -' ~ `
Reinforcement
- ---- _ - -
.__ _
__
LIFER ~ ,~
Porch/Deck Piers
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
re
Permit # BLD03-151
REnITTRF,n TN~PF.[''TT(lNC
A DDD n~T~ t~ m ~ m~
~.
FOUNDATION
Stem Wall
~ ~ ~p 3
Forms
Reinforcement
Vents - 6 Required
Anchor Bolts
Ho downs
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrester @ clothes & dishwashers i
Hose Bibs (backflow protection required) ~/
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
R-10 under if electric
Seismic Restraint -strap tank @ 1/3 points ;'
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
_ ~.
MECHANICAL /
Whole House Fan @ upstairs bathroom -Max. 75 CFM f
KitcheniBath/Laundry Fans /~~
Environmental Air Exhaust ducting (w/ backdraft dampers), t J
insulation (R-4) and terminus (located 3' from openings)
Call 48 hours before you dig for utility line locates
1-500-424-5555
Page 2 of 4
r
1
R_EQ-AIRED INSPECTIONS
Pemtit # BLD03-151
APPRnVFn/nATF,
FRAMING -- - - - - -- - - -
-,~ ~ ~~- c C7 ~ - ~~-~
~-
V~alls ,
.
Shear Walls -per architectural design.------ •-•. ~
_ _ ,_ _ . _
_ .._ ~, ~ ' ~ ~ ~ ~ ~' °3
~
.~
~~ •^ `a
_
-- .-_. _ _
Ceilings •,,
.-
.
Posts, Beams & Headers -
Roof
}
Ridge Beam - ~
Blocking
Rafter Positive Connection - H1
Roof Venting - eave and ridge vents
Windows -escape
Windows- safety glazing
Windows Ufactor - .40 or better
NFRC window sticker must be on windows &
doors at inspection time
Fresh Air Intake (Window Ports)
Doors U-Factor - .20 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
f •
Walls (R-21)
_C~iling (R-~Qvault~ 38-.attic )
Vapo~Barrier:~~aint fer walls and ceiling
Baffles
DRY WALL NAILING
Walls `~ '
Ceiling
A
Enclosed Usable- Space under Stairs ,
FINAL
Public Works Sign-Off ~ • -
Parking -1 space required s
House Numbers - 5" minimum
Plumbing
Mechanical/Heating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building
Ca1148 hours before. you dig for utility line locates
1-800-424-5555
Page 3 of 4
Permit # BLD03-151
GENERAL CONDITIONS .-
1. Contractors working on this project are required to have a Labor & Industries contractor's registration number ana~
City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this
is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning
construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see
attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils ezposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings,
sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require
inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been
completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is reauired
Public Works approval must be received prior to scheduling the Building Department's final inspection
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project.
8. All building permits ezpire if no progress has been made within six months, or if no inspections are done by the Building
Department within one year. Call for at least one inspection per year to keep your building permit active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department _
3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
'/_, r
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 4 of 4