Loading...
HomeMy WebLinkAboutBLD03-150Watemmn & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-150 Issued: 07/30/03 Parcel Number: 989 705 601 Job Address: 802 Washington Street Zoning: C-III Type: V-N Occupancy: M Nature of Work: Reulace aluminum windows with same size fixed wood windows for Antique Mall. Owner: Michael Jones Contractor: Owner Window replacement approved by Historic Preservation Committee 7/1/03 through HPC03-021. GENERAL CONDITIONS APPLY -SEE NEXT PAGE RF.(1TTTRFT) TNCPFf TTnN4 A PPR (1VF,T)/n A TF, FRAMING/FINAL: Window Ufactor - .90 or better per NREC NFRC window sticker must be on windows at inspection time Air Seal FINAL Building Numbers -min. 5" high Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Pemrit #BLD03-I50 GENERAL CONDITIONS 1. Contractors workin on this ro'ect are re uired to have a Labor & Industries contractor's re istration g P J q a number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. . Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page Z of 2