CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD03-147 Issued: 07/25/03 Parcel Number: 989 711 204
Job Address: 1622 Franklin Street Zoning: R-II Type: V-N Total Occupant Load: 1
Occupancy: R-II Nature of Work: Construct New ADU next to 1614 Franklin Street
Owner: John Monsour & Marsha Tornow Contractor: E. McFadin Enterprises -
EMCFAE*98605
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
~~T ATTTT1T7l TILT Cr 71T lrTTl11~TC
s upu nvF.r~m A TF.
lti`~ Vli\L'L 11\-JiL~.iivl\v
TEMP EROSION & SDM'T CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the
site -------
FOOTINGS
Setbacks , , ~`~F . ,; , ~ IF;
,~
Footings ` ~ " "
Forms
ement _ _ _ _ _ _ _--- -- -- - - __- _ _____
Porch/Deck Piers
LIFER , ,
FOUNDATION ~
Stem Wall ~;~ ~~
~
i~ u~`"~,`~;„
Forms y
Reinforcement ,- ~ _
Holdowns _ _
Anchor Bolts & BP washers ~ f ~, ~ ' % ' ~,~-, ~ ,~.
Vents - 3 required _. ,
• Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 4
Pertmt # BLD03-147 ~
REQUIRED INSPECTIONS
APPROVED/DATE
FLOOR FRAMING '~
NOTE: Engineered BCI floor plan on-site and
available to the Inspector at inspection time
Joists
g 7
0 d~
Blocking .
Positive Connections
Treated Wood to Concrete
PLUMBING:
ou -In -V-T & Clean outs
Water Supply ~ ZS 2.~ Q'3
Gas Supply ~ (> j .._- -~'7 ~•
-ti.__...
Water~iammer es or is ~ ~ ~
-._-
~
-- .
r
Hose Bibs (backflow protection required) `'-~-- - - -~-- '~
Pipe Insulation (R-3)
Pressure Reduction Valve if > 80 psi
Water Heater
Seismic Restraint - 2 places
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
18" A. F. F.
R-10 under
MECHANICAL
LPG Stove /Fireplace - provide specs on-site
Manufacturer's installation instructions to be on-site @
time of inspection.
Source Specific Exhaust Fans @ bathrooms (SOcfm),
laundry room, (50 cfm) and kitchen (100 cfin)
Environmental Air Exhaust ducting (w/ backdraft
dampers), insulation (R-4) and terminus (located 3' from
openings)
Whole house fan -bathroom
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 4
Pemrit # BLD03-147
REQUIRED INSPECTIONS
APPR(~VF'n/nATT
FRAMING ~,. ~-~' ~ ~ 1Z -~,?,L.~'~._ c~~°` I ~ t ~
Walls ,
Joists -NOTE: Engineered BCI floor plan on-site and
available to the Inspector at inspection time
Roof
Rafters
Attic venting
Deck
Windows -escape
~~~,.
t
~~
~
`
~
i~~ ~
Windows -safety glazing '~ ~~_
" '
~
Window U-factor - 0.40 or better ~- _
Door U-factor - 0.20 or better
Skylight U-factor - 0.58 or better
NFRC sticker must be on windows, doors & skylights
at time of inspection
Air Seal ~,~;~~~~
Fresh Air Intake - wi~w ports
Fireblocking
Weather Resistive Barrier
SULATION
~,, .
~
~ ~
~ ~
~
door (R-30) P~,
. ~- ? /
~~
Walls (R-2~ _w~ _...__ ~~._.__ . _~r.~_~~, u. _ .._ _~~,
~_._ _._. _
` a ~ ,..
_ _ _
_..__
Ceiling (R-30) _ ~ ` ~ f
,r
~t :> , ~r ~ _ _
f,
_.
rB-arrier:_paint _ _
_._._ _ . _._.__~_,~~.._ ~_..~___
__
awes ~~ ,. ° i ~^ ~ ~ ,
,~' '',~
_ ~e.
DRY WALL NAILING
Walls ~ _ ~
- - ~ ,~
_.
Ceiling - -~
FINAL
House Numbers @ ADU - 5"minimum
Plumbing "
LPG
MechanicaUHeating i
Deck/Stairs/Landings /~
Insulation Certificate
Vapor Barrier Paint Certificate ' ~ " ~`_,
Smoke Detectors
Final -Building
Call 48 hours before ou di for utili line locates
Y g t3'
1-800-424-5555
Page 3 of 4
Permit # BLD03-147 ~
4
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval rior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITII THE APPROVED PLANS.