Loading...
HomeMy WebLinkAboutBLD03-147t • W atemian & Katz Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)385-7675 rTTV OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD03-147 Issued: 07/25/03 Parcel Number: 989 711 204 Job Address: 1622 Franklin Street Zoning: R-II Type: V-N Total Occupant Load: 1 Occupancy: R-II Nature of Work: Construct New ADU next to 1614 Franklin Street Owner: John Monsour & Marsha Tornow Contractor: E. McFadin Enterprises - EMCFAE*98605 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 ~~T ATTTT1T7l TILT Cr 71T lrTTl11~TC s upu nvF.r~m A TF. lti`~ Vli\L'L 11\-JiL~.iivl\v TEMP EROSION & SDM'T CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site ------- FOOTINGS Setbacks , , ~`~F . ,; , ~ IF; ,~ Footings ` ~ " " Forms ement _ _ _ _ _ _ _--- -- -- - - __- _ _____ Porch/Deck Piers LIFER , , FOUNDATION ~ Stem Wall ~;~ ~~ ~ i~ u~`"~,`~;„ Forms y Reinforcement ,- ~ _ Holdowns _ _ Anchor Bolts & BP washers ~ f ~, ~ ' % ' ~,~-, ~ ,~. Vents - 3 required _. , • Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 4 Pertmt # BLD03-147 ~ REQUIRED INSPECTIONS APPROVED/DATE FLOOR FRAMING '~ NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time Joists g 7 0 d~ Blocking . Positive Connections Treated Wood to Concrete PLUMBING: ou -In -V-T & Clean outs Water Supply ~ ZS 2.~ Q'3 Gas Supply ~ (> j .._- -~'7 ~• -ti.__... Water~iammer es or is ~ ~ ~ -._- ~ -- . r Hose Bibs (backflow protection required) `'-~-- - - -~-- '~ Pipe Insulation (R-3) Pressure Reduction Valve if > 80 psi Water Heater Seismic Restraint - 2 places Pressure relief valve drain to exterior, terminate 6" - 24" above ground 18" A. F. F. R-10 under MECHANICAL LPG Stove /Fireplace - provide specs on-site Manufacturer's installation instructions to be on-site @ time of inspection. Source Specific Exhaust Fans @ bathrooms (SOcfm), laundry room, (50 cfm) and kitchen (100 cfin) Environmental Air Exhaust ducting (w/ backdraft dampers), insulation (R-4) and terminus (located 3' from openings) Whole house fan -bathroom Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 Pemrit # BLD03-147 REQUIRED INSPECTIONS APPR(~VF'n/nATT FRAMING ~,. ~-~' ~ ~ 1Z -~,?,L.~'~._ c~~°` I ~ t ~ Walls , Joists -NOTE: Engineered BCI floor plan on-site and available to the Inspector at inspection time Roof Rafters Attic venting Deck Windows -escape ~~~,. t ~~ ~ ` ~ i~~ ~ Windows -safety glazing '~ ~~_ " ' ~ Window U-factor - 0.40 or better ~- _ Door U-factor - 0.20 or better Skylight U-factor - 0.58 or better NFRC sticker must be on windows, doors & skylights at time of inspection Air Seal ~,~;~~~~ Fresh Air Intake - wi~w ports Fireblocking Weather Resistive Barrier SULATION ~,, . ~ ~ ~ ~ ~ ~ door (R-30) P~, . ~- ? / ~~ Walls (R-2~ _w~ _...__ ~~._.__ . _~r.~_~~, u. _ .._ _~~, ~_._ _._. _ ` a ~ ,.. _ _ _ _..__ Ceiling (R-30) _ ~ ` ~ f ,r ~t :> , ~r ~ _ _ f, _. rB-arrier:_paint _ _ _._._ _ . _._.__~_,~~.._ ~_..~___ __ awes ~~ ,. ° i ~^ ~ ~ , ,~' '',~ _ ~e. DRY WALL NAILING Walls ~ _ ~ - - ~ ,~ _. Ceiling - -~ FINAL House Numbers @ ADU - 5"minimum Plumbing " LPG MechanicaUHeating i Deck/Stairs/Landings /~ Insulation Certificate Vapor Barrier Paint Certificate ' ~ " ~`_, Smoke Detectors Final -Building Call 48 hours before ou di for utili line locates Y g t3' 1-800-424-5555 Page 3 of 4 Permit # BLD03-147 ~ 4 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc, once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is reauired. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval rior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITII THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4