Loading...
HomeMy WebLinkAboutBLD03-146 Waterman & Katz Building 18I Quincy Sfreet, Suite 301 Port Townsend, WA 98368 Phone:360-379-5086 Fax360-3857675 (:ITY OF PORT TOWNSEND ~1 ~J CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD03-146. Issued: 07/23/03 Parcel Number: 968 500 015 Job Address: 3944 Holcomb Street Zoning: R-II Type: V-N Occupancy: R-3/iJ-1 Total Occupant Load: 5/2 Nature of Work: Construct Single-family Dwelling with attached garage Owner: Trov Frutiger Contractor: Trov Frutiger TROYFHC9870Q GENERAL CONDITIONS APPLY: See last page SEPARATE PERMITS REQUIRED: Electrical Permit -_Contact WA State Dept. of Labor & Industries 360-417-2702 :~- HOURS OF CONSTRUCTION in Lynnesfield PUD shall be limited to 8 am - 6 pm Monday through Friday and prohibited Saturdays, Sundays and holidays. Any exception made necessary by special and unusual circumstances must be approved in advance by the Building Official. ,~T.~.T,T>n>cn Tl~rc~~rm7ntve APPRnVED/DATE 1<L V11\L'L 11\1J1 L't.livi~r..i ------- TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings ' ~ ~ Forms ~ ~ I f. ~ ~ ~, , Reinforcement _,.~._.. _ __ - _ , r,~'._ - .._..._ `~' ~ ~ ~ ,> ,° < , f ~ ~ ~° ~, ~ . _ - Interior Footin s _ __ _ _ ._ , _.. _, _ orc ootings '~~ , LIFER ~ ~~~ ~ v I `_- CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 4 Building Permit #BLD03-146 REQUIRED INSPECTIONS APPROVED/DATE FOUNDATION Stem Wall ~ ~ ' Forms ~ ;p ~ ~ ~ a 3 b3 ~ Reinforcement F- Anchor Bolts & Washers Post to Foundation Wall Positive Connection GROUNDWORK PLUMBING L For Future Bath ~ Pressure Test yy Pipe Joints Exposed Pipe Bedding ~b 3 ~ 3 f ~ b ~ / f PLUMBING Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrestors ~ ~~ LPG Gas Supply Hose Bibbs - backflow protection required Pipe Insulation (R-3) (` Pressure Reduction Valve if > 80 psi Water Heater ~``\ R-10 under if electric j ~ \ Seismic Restraint - 2 places V ~ Pressure Relief Valve drain to exterior, terminate ~ ' 6" -24" above ground ~ ` MECHANICAL ' LPG Stove - provide specs on-site Manufacturer's installation instructions to be on-site `~.. '~ @ time of inspection. Source Specific Exhaust Fans @ bathrooms (SOcfin), ~ laundry room, (50 cfin) and kitchen (100 cfm) / Environmental Air Exhaust ducting (w/ backdraft ~ dampers), insulation (R-4) and terminus (located 3' L'A from openings) Whole house fan -Laundry _ ~~ C~ 1~~~4 ~~ ~>r>~ J Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 REQUIRED INSPECT><nNS 1'-1 LJ Building Pemvt #BLD03-146 s npunv~nm ~ m~ - ---- FRAMING X111\V • a.LL/LL711% Floor -Engineered BCI plan to be on site at inspection Walls _ - __ _ __. Shear walls ~ ~ ;, , , ~ ~ Shear Panel Blocking --~ . Roof- Engineered truss plan to be on site at inspection Attic venting -ridge & eave " Posts, beams and headers Windows -escape Windows -safety glazing Window U-factor - 0.40 or better - Door U-factor - 0.20 or better Skylight U-factor - 0.58 or better NFRC sticker must be on windows, doors & skylights _ . at time of inspection Air Seal Fresh Air Intake -window ports Fireblocking Weather Resistive Barrier INSULATION Floor (R-30) Walls (R-21) Ceiling (R-38 attic; R-30, vault) ~'} ~~, Baffles , '~:~; s Vapor Barrier -paint ~ DRYWALL NAILING Walls Ceiling Garage /House Occupancy Separation FINAL s { ~./ - ~ rp ~ ~ ~ ' Public Works Sign-off _ ` - A - ` House Numbers - 5" numbers A ~• , ~ ~' ~ - ~ _ ~ ~ ,, ~ ~ _ ~ ~ t ~ . .. Plumbin g ~ ~ 4- ~. ; , , LPG - ~ ,. ~ ~ ,,~ ; / ' MechanicaUHeating ' • ~ " / r Insulation Certificate -` `~ -' ` ' ` ` ~ ` ~~ ~ <" . r i - Vapor Barrier Paint Certificate i ;" l Smoke Detectors Stairs, Decks & Landings Final -building Call 48 hours before you dig for utili line locates ty 1-800-424-5555 Page 3 of 4 E.<, ~. Building Permit #BL17t)3-146 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one ,year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4